Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Copper Electrowinning at BHAS

    By Mark C. J

    Since the commissioning of the BHAS Copper Plant in 1984 the copper electrowinning operations have not fully met expectations. During 1988, a laboratory scale electrowinning unit was constructed to

    Jan 1, 1989

  • AUSIMM
    Recovery of Zinc from Smelter Off-Gases Using a Fluidised Bed Condenser

    By F R. A Jorgensen, G W. Jensen

    A pilot scale experimental investigation of the condensation of zinc vapour from smelter off-gases was performed in conjunction with a mathematical modelling study of the system. The work investigated

    Jan 1, 2000

  • AUSIMM
    The Financing and Development of the Nagamble Gold Mine, Victoria

    The Nagambie heap leach gold mine commenced production of gold in September, 1989. The mine,120km north of Melbourne in Victoria, Australia, was developed by Perseverance Mining Cor- poration Ltd, a

    Jan 1, 1991

  • AUSIMM
    Some Gold Bearing Rocks at Bingara, N.S.W.

    The locality from where these specimens come is distant about 12 miles due south from the township of Bingara New South Wales, and is known locally as Carney's Reef, Barrack's Creek, Top Bin

  • AUSIMM
    Geology and Ore Deposits of Masara Mine, Davao del Norte, Philippines

    By Estoque J, Lodrigueza L, Rebillon F

    Ore mineralization in Masara consists mainly of gold-silver veins, porphyry copper and pyrometasomatic deposits related to left-lateral movements along the Philip- pine fault system and a later sta

    Jan 1, 1987

  • AUSIMM
    Model Study of the Stability of the Rock Surrounding A Tunnel

    By Junpeng L, Huiguo Q

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • AUSIMM
    Vertical Crater Retreat Pillar Mining-A Case Study

    The Vertical Crater Retreat (VCR) mining method was used to mine two rib pillars at New Broken Hill Consolidated Limited (NEHC) mine at Broken Hill. Experience gained in a trial VCR pillar stope w

    Jan 1, 1983

  • AUSIMM
    Optimisaiton in the Concentrator - the Practical Realities

    By Morrison R

    Optimisation has two distinct applications in the concentrator ò the first is in the area of the flowsheet and the operating parameters of the various unit operations ò the second is associated with

    Jan 1, 1991

  • AUSIMM
    Practical Application of Geological Modelling Techniques to Gold Orebody Evaluation and Mine Planning

    By Duke J. H

    Advanced computer aided geological modelling techniques are now available to the geologist to allow the rapid evaluation of a gold orebody at various stages of its development. The types of grade

    Jan 1, 1989

  • AUSIMM
    Production improvement opportunities in comminution circuits

    By M Yahyaei, M S. Powell

    Mineral processing plants have become large and complex, generally through progressive expansions. Addition of a pre-crushing stage to conventional Semi-Autogenous-Grinding (SAG) and ball mill - crush

    Aug 29, 2018

  • AUSIMM
    Protection of Sacred Sites in the Northern Territory

    The role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli

    Jan 1, 1984

  • AUSIMM
    Occupational Health Effects of Airborne Coal Dust and mine Gases

    The last 40 years has seen a dramatic reduction in the prevalence of pneumoconiosis through improved mining engineering associated with continuing medical surveillance of those at risk. Presently t

    Jan 1, 1983

  • AUSIMM
    Process Mineralogy of a Low-Grade Tantalum-Niobium Ore in China

    Most of the Ta-Nb ores in China occur in altered granites, and Ta-Nb minerals occur in these granites as accessory minerals. This type of Ta-Nb ores are characterised by whole mineralised granite mass

    Jan 1, 2008

  • AUSIMM
    Obtaining a Representative RCSample ù The Cone Splitter Versus the Tiered Riffle Splitter

    By P Church

    What is the best method of splitting a sample from a reverse circulation drill rig? How important is it to obtain a correctly split sample? What is the impact of an incorrectly split sample? These are

    Jan 1, 2003

  • AUSIMM
    The Use of Electronic Detonators as a Key to Reducing Overall Mining Costs

    Drill and blast operations account for 12 - 15 per cent of total mining costs. This paper looks at a comparison between electronic detonators and non-electric detonators, focusing on the cost benefits

    Jan 1, 2008

  • AUSIMM
    Selection of Primary Support in the EastLink Tunnels

    By P Campi, M Dodds

    The EastLink project is a 39 km tollway to the east of Melbourne and includes twin three-lane 1.5 km driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the Mul

    Jan 1, 2008

  • AUSIMM
    Paper No. 161. Bromo-Cyaniding of Gold Ores.

    Although the bromo-cyanide or Diehl process for the extraction of gold from its ores is used on several of the Kalgoorlie mines, very little information has been published on the original process, and

    Jan 1, 1907

  • AUSIMM
    The Iron Ores of Yampi Sound, Western Australia

    By Edwards A. B

    Yampi Sound is a small channel in the Buccaneer Archapelago (latitude 16° 10' S.; longitude 123° 40' E.), on the northern coast of Western Australia (Fig. 1), about 90 miles north

    Jan 1, 1938

  • AUSIMM
    Concentration of Fine Grained Heavy Minerals Using the Kelsey Centrifugal Jig

    By Waldram JT

    The Kelsey Centrifugal Jig incorpo- rates the principles of operation of a conventional mineral jig, at the same time utilising high centrifugal forces to extend concentration to very fine heavy m

    Jan 1, 1986

  • AUSIMM
    Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator

    By Russell J

    A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980. It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain

    Jan 1, 1978