Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine Development

    By L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang

    The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.

    Jul 10, 2012

  • AUSIMM
    Analyses of pressure drop in high temperature zone during iron ore sintering

    By S Mitra, T Singh, D O’Dea, T Honeyands

    Permeability and air flow rate in the bed during iron ore sintering is crucial to controlling the sinter quality and productivity of a sinter plant due to its influence on the flame front speed. In th

    Nov 8, 2021

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Improving Open Stope Productivity at Sunrise Dam

    By K Guilfoyle

    AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo

    Nov 8, 2011

  • AUSIMM
    Chilean lithium mining – a safe place

    By M Jara, R Nuñez

    As the global interest in sustainable energy sources has increased, lithium has emerged as a vital resource, playing a crucial role in the transition towards a cleaner and more efficient economy, but

    Apr 16, 2024

  • AUSIMM
    Measuring and Utilising Ore Quality Variability Using Real-time On-belt Elemental Analysis to Improve Mill Feed Quality

    By H Kurth

    "The focus of this paper is on measuring the composition to improve mill feed quality to minimise the processing of waste, optimise process performance, reduce processing costs and minimise the genera

    Oct 10, 2016

  • AUSIMM
    Creating the Optimal Coal Working Section

    By P Lukic

    The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on

    Sep 26, 2011

  • AUSIMM
    The Hydrogeological Problems of Groundwater Protection in Mining Regions

    The investigations of the Leningrad ruining lilstitute on this problem are carrying out in the following main directions: 1) The analysis and study of contaminants migration at particular sites of m

    Jan 1, 1988

  • AUSIMM
    A review of the most common underground slot, winze, rise or raise designs

    By E Wargem

    The conventional method of underground mining involves a process known as drilling and blasting to excavate valuable ore bearing minerals through the load and haul process. Drilling and blasting proce

    Mar 29, 2023

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Thermal Treatment of Angouran Lead and Zinc Flotation Plant Oxidised Tailings, Iran

    By S M. J Koleini, F Hedjazi

    The purpose of this research was to study the calcination of lead-zinc flotation tailings from the Angouran lead and zinc flotation plant in Iran as a pre-concentration step prior to hydrometallurgica

    Jan 1, 2004

  • AUSIMM
    Reconciliation – Outcomes and Expectations

    By W J. Shaw

    Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin

    Aug 18, 2014

  • AUSIMM
    A Novel Blasting Technique to Create Drawbells and Eliminate the Undercut Level in Block Cave Mining

    By A Tawadrous, D S. Preece

    Cave mining is of interest to the mining community as it offers a chance to extract large, deep orebodies with low operating costs and high production rates. It allows for extracting large low-grade o

    Aug 24, 2015

  • AUSIMM
    Life Cycle Assessment of Copper and Nickel Production

    By W J. Rankin

    A study of refined metallic copper and nickel production was carried out using Life Cycle Assessment methodology to estimate the life cycle emissions of greenhouse and acid rain gases for these metals

    Jan 1, 2000

  • AUSIMM
    El Teniente New Mine Level Project

    By R Pozo, F Reyes

    Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo

    Jan 1, 2008

  • AUSIMM
    Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, Queensland

    By M Norbert, C Bennett

    The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i

    Sep 17, 2014

  • AUSIMM
    Upstream Raising of Laterite Nickel Tailings Storage Facilities

    By D A. Williams, J C. J Boshoff

    The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad

    Jul 27, 2015