    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    The Pyroxene Granulites and Associated Gabbros of the Fraser Range, Western Australia, and their Economic Significance

    The Fraser Range is composed dominantly of basic pyroxene granulites derived from basalts, many of which appear to have been vesicular and pillowed. Acidic and basic garnet-bearing granulites are impo

    Jan 1, 1969

  • AUSIMM
    Influence of Frothers on Bubble Shape and Velocity Close to the Generation Point

    Influence of Frothers on Bubble Shape and Velocity Close to the Generation Point

    Sep 13, 2010

  • AUSIMM
    Acid leaching of chromite-bearing nickeliferous laterite from Rockhampton, Queensland

    Mineralogical analysis of a nickeliferous laterite from the Rockhampton region shows that the nickel is largely associated with the manganese wad and opaline silica. The laterite also contains an appr

    Jan 1, 1986

  • AUSIMM
    Manufacture of Cement From Blast-Furnace Slag (6eef645a-945d-4a5e-8744-528d84407d12)

    THE successful establishment of iron blast-furnace plants at Newcastle and Lithgow naturally invites attention to the economic utilization of the various products and by-products arising out of the in

    Jan 1, 1918

  • AUSIMM
    Commissioning and Ramp-up of the Albion Process at the GPM Gold Project

    By M Hourn, D Turner, P Voigt, D Mallah

    The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced i

    Sep 7, 2015

  • AUSIMM
    Utilisation of Latrobe Valley Brown Coal Fly-Ash

    By Milner A, Brockway D, Hodges S

    The combustion of brown coals in Latrobe Valley power stations produces approximately 500 000 tonnes of solid wastes each year. This material, which includes precipitator ash, char and furnace ash,

    Jan 1, 1992

  • AUSIMM
    Drawbacks in Sluice box operating Practices in Papua New Guinea

    Sluice box operating practices in Papua New Guinea (PNG), and published work on sluice boxes are briefly reviewed. Some recent work on sediment entrainment mechanisms occurring in sluice boxes hav

    Jan 1, 1991

  • AUSIMM
    Presidential Address

    In referring to two subjects of interest to the Members of this Australasian Institute of Mining Engineers, I would at the outset desire to express our gratification that to-day we are able to welcome

    Jan 1, 1901

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950

  • AUSIMM
    Tapping Water by Diamond Drill Holes

    ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level

    Jan 1, 1919

  • AUSIMM
    High Grade Metamorphic Structures in the Broken Hill Orebody

    The Broken Hill orebody ,occurs in the Willyama Complex, a block of Precambrian rocks which have been strongly folded and metamorphosed at moderate to high grade. Although -the origin of the silver-le

    Jan 1, 1975

  • AUSIMM
    Trends in Test Filtration to Respond to Decreasing Sample Size

    Trends in Test Filtration to Respond to Decreasing Sample Size There has been a steady decline in the quantity of samples available for testwork when developing new mining processes due to the maturi

    Sep 13, 2010

  • AUSIMM
    Taxation Neutrality in Mining

    The Government signalled its intention in the Economic Statement on 17 December 1987 to improve the fairness of the taxation system and to facilitate the process of economic adjustment by: removing t

    Jan 1, 1988

  • AUSIMM
    Deep Sea Tailing Placement - Water Quality Impacts

    By P To, A Sharp-Paul, S Jones, C Monahan

    A key environmental management issue associated with mining projects is tailing disposal. In high rainfall environments this is particularly challenging and generally requires the discharge of excess

    Jan 1, 1999

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010

  • AUSIMM
    Geochemistry of Altered Rocks and Mass Transfer at Broadlands-Ohaaki

    By S F. Simmons

    The Ohaaki Rhyolite and the Rautiwiri Breccia are two volcanic units occurring in the shallow and deep parts of the Broadlands-Ohaaki geothermal system. Alteration of these units by chloride waters re

    Jan 1, 2002

  • AUSIMM
    The Geology of the Chinaman Creek Disseminated Copper Prospect, Near Mount Perry, South-East Queensland

    Copper mineralization associated with minor molybdenum, silver, and gold occurs in a hydrothermally altered brecda within a granodiorite mass of Upper Permian age. A dyke system of rhyolite, dacite, a

    Jan 1, 1972

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • AUSIMM
    Geometric Control for Strategic Mine Planning at El Teniente Mine

    By J Cornejo, A Pinochet, C Caviedes

    The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp

    May 9, 2016