Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mineBy N Pranoto, E Lawell, T Dean, M Grant
The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These
Mar 22, 2022
-
Filling Operations at Mount IsaBy Hunter GW
This paper gives an account of the filling system at Mount Isa from surface fill production to stope discharge underground. A brief explanation of the surface facility and reticulation is given pr
Jan 1, 1982
-
Implementation of Mine to Mill Blast Optimisation at Porgera Gold MineBy S S. Kanchibotla, D La Rosa, R W. Pesch
The Porgera Joint Venture and Dyno Nobel have commissioned a joint project to optimise the drill and blast operations to increase the overall profitability of the mine. One of the aims of this project
Jan 1, 2003
-
Electrowinning of Copper at High Current Densities Part IBy Andersen AK
As part of a research program sponsored by Continental Copper and Steel Industries, Inc. (cos), investigations have been conducted by the Colorado School of Mines Research Foundation, Inc. to study
Jan 1, 1969
-
Road to Recovery - Metallurgical Improvements at Brunswick Mining and Smelting Corporation LimitedBrunswick Mining and Smelting Corporation Limited operates a large base metal property near Bathurst, New Brunswick in eastern Canada. Nominal capacity for the underground mining operation and conce
Jan 1, 1993
-
Microseismic Monitoring for Gas Outbursts at Leichhardt CollieryBy Ahmed M, Leung L
A program of microseismic noise monitor ing for gas outbursts, in conjunction with other mining engineering measurements and observations, is being undertaken at Leichhardt colliery in Queensland.
Jan 1, 1980
-
Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesBy Baafi E. Y
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res
Jan 1, 1998
-
Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical ClimateBy A M. Barrett, P J. Chapman
As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b
Jul 27, 2015
-
Production of Fertilisers and Smelter-Grade Alumina by Alkali Leaching of Christmas Island 'B' and 'C' Phosphate OresCrandallite and millisite in Christmas Island 'B' and 'C' phosphate ores are rapidly decomposed by sodium hydroxide solutions at about 80QC. As these phosphates generally contain
Jan 1, 1971
-
The Use of Genetic Algorithms in Underground Mine SchedulingBy Schofield D
The problem of production scheduling is sufficiently complex to negate the use of many conventional optimising techniques as there are numerous and diverse factors that must be considered when tryin
Jan 1, 1995
-
Indicator Kriging and Other New Geostatistical ToolsBy Baafi EY
Geostatistics is now widely used in the mining industry in the estimation of ore reserves and terms like kriging, variogram and estimation variance are becoming well known. Ordinary Kriging (OK) ha
Jan 1, 1987
-
Reducing Gassiness of Outburst-Prone Coal at Coal Basin Mines, Colorado, USABy Martin T
High methane content of the medium volatile metallurgical coal mined from the Coal Basin mines causes very difficult mining conditions. Rapid desorption into the mine ventilation system limits coal
Jan 1, 1982
-
Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w
Jan 1, 1980
-
Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa MineBy Kobayashi M
Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I
Jan 1, 1990
-
Recovery of Metallic Zinc from Steelmaking Dusts by the Reduction-Vapour Depositions ProcessThe extinction of zinc from steelmaking dusts has been studied with a laboratory scale reduction-vapour deposition (RVD) process in the absolute pressure and temperature ranges of 13 - 1300 Pa and 1
Jan 1, 1993
-
Advances in Dense Medium Cyclone Plant DesignBy G Gibson, B Bessen
In coal preparation, large dense medium cyclones (DMC) at low pressure heads (typically 9D where D = cyclone diameter) are the norm. This contrasts with high density mineral applications where, largel
Jan 1, 2009
-
Managing Process Water Quality in Base Metal Sulfide FlotationBy R Dunne, S Hart, G Levay
While water represents a major proportion of the mineral pulp processed in flotation circuits, relatively little research effort has been committed to understanding and controlling the influence of wa
Jan 1, 2003
-
Review of Ground Support Systems at King Island ScheeliteBy Nag D. K
King Island Scheelite is a wholely owned subsidiary of Peko-Wallsend Ltd. The company works two underground mines near the southern end of King Island at the western approach to lass Strait, 240 k
Jan 1, 1981
-
Planning Of Exploratory Drilling Programs, Logging And Sampling Of Explotary Drill Holes For CoalBy Svenson D
For fully effective information to be obtained from exploratory drilling for coal, drilling programs should be planned systemati- cally in successive stages, on the basis of existing geological crit
Jan 1, 1977
-
Coal Mine Modelling And Evaluation Using Numerical GeologyBy Koppe J. C
This study presents the procedure of mine modelling and reserve evaluation by means of statistics, computer interpolation methods and aerophotography interpretation. All data are from Carbonifera Trev
Jan 1, 1993