Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    Design and Development of Energy-efficient Secondary Axial Flow Fans

    By J J. L du Plessis, S Viviers, G Ratner

    Escalating electricity costs are one of the biggest operational cost drivers in mining. The trend to use high-powered auxiliary fans delivering increased airflow to meet the dilution requirements of d

    Aug 31, 2015

  • AUSIMM
    Coal as a Source Rock for Hydrocarbon Gas in the Aldebaran Sandstone, Denison Trough, Bowen Basin - Geochemical Evidence

    By Golding S. D, Price P. L

    The Early Permian Aldebaran Sandstone is the main hydrocarbon reservoir in the Denison Trough. Contained hydrocarbon gas has a wet gas index (C1/CI - C4) of between 0.87 and 0.97 (N=10), and consti

    Jan 1, 1991

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    Performance Enhancement at BHP BillitonÆs Newman Beneficiation Plant

    By G McSpadden

    At September 2001 the beneficiation plant at BHP Billiton Iron OreÆs Mt Whaleback mine is set to treat 9.5 million tonnes per annum (Mtpa) of iron ore, 40 per cent better than original design. This pa

    Jan 1, 2002

  • AUSIMM
    Optimising the Long Term Profit base for Consolidated Rutile Limited

    Consolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was

    Jan 1, 1991

  • AUSIMM
    Study on Paste Tailings Capping Ecology Reclamation on Acid Mine Waste Rock Dump

    By Z Lianbi, Z Yibin, Z Youhong, P Bin

    Without adequate soil available, it is difficult to rehabilitate a large area of acid mine waste dump with sustainable plant communities, which has a strong potential acid generation. In the present p

    Jul 10, 2012

  • AUSIMM
    Electricity and Compressed Air Power Supply to Surface and Underground Workings

    The Western New South Wales Electric Power Proprietary Limited is the central generating authority for distribution of power to the majority of the Broken Hill mining companies and the Broken Hill Wat

    Jan 1, 1957

  • AUSIMM
    Iron Island, Queensland.

    By Campbell Brown G A

    IN 1904-5 diamond drilling operations in the Mount Morgan mine proved the presence of some millions of tons of rich copper-gold ore, averaging about 45%to 50%silica and 22%Fe as sulphide. To smelt thi

    Jan 1, 1911

  • AUSIMM
    Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt Reactors

    By Denholm W. T

    The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r

    Jan 1, 1989

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    What the Internet of Things Means to Mining

    By D Kent, D Eisner

    A lot of talk has been generated about the so called ‘Internet of Things’ (IoT) and its potential to transform the way we interact with our homes and devices. But the true potential and value of IoT i

    Nov 4, 2015

  • AUSIMM
    Worthing Mine and its Historic Enginehouse

    By Connell JE

    The Worthing Mine near Hallett Cove. 20 km southwest of the cite of Adelaide, belongs to Aus- tralia's first mining era, which took place in South Australia between 1841 and 1851 (Figure 1). Op

    Jan 1, 1987

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Design and Evaluation of Dry Fill

    By Blair J. R, Barrett J. R

    In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry

    Jan 1, 1973

  • AUSIMM
    Coeur d'Alene Mines - A Commitment to Growth

    Coeur d'Alene Mines is a precious metals producer which is dedi- cated to growth through it's exploration and acquisitions efforts. We foster and support these activities by providing our s

    Jan 1, 1991

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Developments in Milling Practice at the Lead/Zinc Concentrator of Mount Isa Mines Limited from 1990

    By Johnson N. W, Munro P. D, Pease J. D

    The Lead/Zinc Concentrator of Mount Isa Mines Limited processes complex fine grained ore from the Isa and Hilton silver-lead-zinc orebodies, producing lead concentrate, zinc concentrate and (until 1

    Jan 1, 1997