Search Documents

  • NIOSH
    RI 3336 Beneficiation Of Spodumene By Decrepitation ? Introduction

    By Foster Fraas

    One of the lithium minerals most widespread in the earth's surface is spodumene (Li2O-A1203-4Si02) a lithium aluminium silicate. For some time, deposits of this mineral were known to exist in the

    Jan 1, 1937

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • SME
    Finite Element Assessment Of The Influence Of Caving On Barrier Pillar Loads In Deep Coal Mines - Introduction - Preprint 09-065

    By W. G. Pariseau

    Conventional barrier pillars in underground coal mines are intended to protect mains and sub-main entries for relatively long periods of time. Inter-panel barrier pillars that may be used in especia

    Jan 1, 2009

  • AUSIMM
    Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and Developments

    Igneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in

    Sep 13, 2010

  • IIMP
    Seguridad y calidad como una ventaja competitiva

    By Orlando Ramírez

    El presente trabajo describe el sistema integrado de seguridad a través de la norma OSHAS 18001 - 1999 y calidad ISO 9001 – 200m, donde la aplicación de la integración controla las desviaciones de lo

    Sep 12, 2005

  • SME
    Turbocharged engines require special lubrication maintenance

    By Jerry T. Shelby

    Surface and underground mining operations require equipment with high power output ratings. Haul trucks, loaders, dozers, and other equipment need increasing horse-power to meet production demands.

    Jan 3, 1987

  • NIOSH
    IC 8839 Minerals Health And Safety Contract Research, Development, And Demonstration In Fiscal Year 1981

    This publication summarizes, for potential contractors and other interested parties, the research, development, and demonstration contract projects programed by the Bureau of Mines for fiscal year 198

    Jan 1, 1981

  • NIOSH
    RI 7964 Physical Property Data on Coal Waste Embankment Materials

    By Richard A. Busch

    Inadequate engineering design criteria for coal refuse embankments has allowed hazardous impoundment structures in coal mining areas to be created. A necessary first step to develop adequate design cr

    Jan 1, 1974

  • AUSIMM
    Gold Dredging Practice in New Zealand û Past and Present

    This paper is in two parts. The first covers the evolution of dredging leading to the development of the æNZ typeÆ large dredge and the second, current alluvial gold recovery practice in NZ. NZ was t

    Jan 1, 1985

  • ABM
    Engenharia De Processo Em Um Laminador De Barras E Perfis Leves

    By José Aparecido Pereira

    Em um laminador de barras e perfis leves (MBQ) é necessário ter um padrão técnico corretamente elaborado a fim de facilitar a preparação do câmbio e tornar o ajuste de bitola (set up) mais rápido gera

    Aug 16, 2017

  • SAIMM
    Stochastic simulation for budget prediction for large surface mines in the South African mining industry

    By V. S. S. Yadavalli, J. Hager, R. Webber-Youngman

    "This article investigates the complex problem of a budgeting process for a large mining operation. Strict adherence to budget infers that financial results align with goals. In reality, the budget is

    Jan 1, 2015

  • AIME
    Louis Davidson Ricketts, President

    The following record of the important responsibilities already shouldered by Dr. Ricketts will give some indication of the trust and confidence reposed in him by his colleagues. The Institute is to be

    Jan 3, 1916

  • NIOSH
    OFR-130(2)-85 High Reliability Miner Hydraulic System - Volume I - Part II - Section III - G Valves - Introduction

    Operator efficiency and control capability along with cost effectiveness have been the quest of mining, industrial, and mobile hydraulic engineers for years. The majority of the functions in present d

    Jan 1, 1983

  • NIOSH
    RI 8494 Inorganic Cement for Mine Roof-Bolt Grouting

    By R. E. Simpson

    Beginning in 1972, fully grouted resin bolts were used in underground mines. An estimated 20 million resin bolts will be installed in 1980 owing to their apparent support improvement in most roof-bolt

    Jan 1, 1980

  • SME
    Will Geophysical Technologies Return to U.S. Coal Fields?

    By Lawrence M. Gochioco

    One of the best kept technology secrets in U.S coalmining history involved a robust coal geophysics program used by a local coal company to detect and map various geologic anomalies and man-made struc

    Jan 1, 2005

  • SAIMM
    Dealing With Open Fire In An Underground Coal Mine By Ventilation Control Techniques

    By N. Sahay

    Open fire in coal mines is one of the most serious threats to miners, as well as to the mine. Open fire can often be effectively dealt with by prompt local action, otherwise it very quickly becomes un

    Jan 1, 2014

  • SAIMM
    The Sasol Engineering Leadership Academy(Part of the Sasol Chair in Safety Health and Environment initiative in the Department of Mining Engineering, University of Pretoria)

    By T. Kagogo, M. Neser, C. Knobbs, E. Gerryts

    "Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a

    Jan 1, 2014

  • SAIMM
    The Sasol Engineering Leadership Academy

    By C. Knobbs

    Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a f

    Jan 1, 2014

  • NIOSH
    OFR-20-84 Feasibility Study Of In-Mine Coal Preparation Facilities

    This work examined the feasibility of in-mine coal preparation in two phases. Phase I included a survey of previous investigations and a preliminary analysis of the economic and technical feasibility

    Jan 1, 1982

  • NIOSH
    OFR-43-79 Cables For Face Equipment, Standardization Of Requirements

    By R. Stefanko

    This first Annual Report covers the work on Contract No. H0377043 "Cable for Face Equipment", from August 1, 1977 to July 31, 1978. It reports the progress in the three areas of over-and short-circuit

    Jan 1, 1978