Search Documents

  • NIOSH
    RI 6058 Safety Characteristics Of Normal Propyl Nitrate

    By Michael G. Zabetakis

    Limits of flammability of normal propyl nitrate (NPN) vapor were investigated at ambient and elevated temperatures. Minimum spontaneous ignition and decomposition temperatures were determined with lab

    Jan 1, 1962

  • SME
    In-Situ Recovery Of Sandstone Uranium Deposits In New Mexico: Past, Present, And Future Issues And Potential - Preprint 09-016

    By V. T. McLemore

    In-situ leaching (ISL) operations have been proposed to recover uranium from sandstone-uranium deposits in NM. ISL (also known as in-situ recovery, solution mining, solution-leach mining, leach mining

    Jan 1, 2009

  • NIOSH
    IC 7281 The Burning Rate Of Fuse - Introduction

    By D. Harrington

    Educational campaigns conducted by the manufacturers of explosives, the Bureau of Mines, mining companies, and safety organizations have contributed greatly in reducing accidents caused by explosives

    Jan 1, 1944

  • DFI
    Excavation Support At The Capitol Visitor Center In Washington DC

    By Harald Ludwig

    In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site

    Jan 1, 2006

  • NIOSH
    IC 8407 Dust Control In Mining, Tunneling, And Quarrying In The United States, 1961 Through 1967

    By Floyd G. Anderson

    This report reviews and summarizes information on prevention and suppression of dust in mining, tunneling, and quarrying published in the United States from 1961 through 1967. Unpublished pertinent da

    Jan 1, 1969

  • AUSIMM
    The Application of Earthmoving Equipment Technology

    Technologies are receiving a lot of 'press' - and rightly so; as they are seen as the means for achieving quantum leaps in productivity and cost reductions. A point of concern for Caterpilla

    Jan 1, 1997

  • ABM
    Análises De Aspectos Geométricos De Convertedores Bof E Correlações Com Parâmetros De Processos

    By Willian dos Reis Lima

    O aumento contínuo da produção de aço nas últimas décadas, fez com que usinas siderúrgicas se adaptassem a novas demandas a fabricação de aço. Este estudo teve como objetivo analisar os reatores que v

    Oct 30, 2017

  • SME
    NAT 2018 Full Proceedings - NAT2018

    By Matthew Preedy, Brett Campbell, Jim Rush, Alan Howard, Derek Penrice

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2018

  • DFI
    Analysis Of A Deep Excavation In Calgary, Alberta

    By Thomas Lardner

    Excavation for The Bow, EnCana, in downtown Calgary, occurred between May 2007 and September 2008. A monitoring programme was used to determine the behaviour of the shoring wall, soil and bedrock dur

    Jan 1, 2010

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • NIOSH
    IC 9483 - Water Well Safety Bits - Health and Safety Information for the Water Well Industry

    By Dana C. Reinke

    A job analysis is a written list of the tasks associated with doing a particular job. In drilling, describing the steps associated with adding rod to the drill steel would be an example of a task asso

    Jan 1, 2005

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • NIOSH
    IC 8126 Blasting Stumps In Coal Mines ? Introduction

    By R. W. Stahl

    The use of continuous mining machines has greatly minimized the necessity for blasting in coal mines, even during pillar recovery; however, explosives are still used to blast stumps. The use of improp

    Jan 1, 1962

  • IOM3
    Potassium, uranium and thorium geochemical maps of the conterminous USA

    By J. S. Duval

    Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). The compilation of the National Uranium Resource Evaluation

    Jul 1, 1991

  • ABM
    Desenvolvimento De Aços Para Estampagem A Quente (Usibor®1500) Na Arcelormittal Vega

    By Ana Paula Domingos Cardoso

    Este trabalho descreve o desenvolvimento, as características técnicas para a produção do produto Usibor® 1500 pela ArcelorMittal. A viabilidade de produção destes materiais é decorrente do processo de

    Aug 17, 2017

  • NIOSH
    OFR-41-91 Land Ownership And The Regulatory Framework For Oil, Gas, And Coal Leasing In Alaska

    By Kenneth M. Maas

    The Bureau of Mines inventoried all lands in Alaska to determine the availability of land for oil, gas, and coal leasing. Acreage for onshore oil, gas, and coal basins was digitized as was land owners

    Jan 1, 1991

  • SME
    Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire

    By D. Bour, C. Nyikos, R. Curtice

    Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti

    Jan 1, 2002

  • AUSIMM
    No. 2 Open Hearth Plant at Port Kembla

    By Edmonds W, Jeffcoat R

    The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives

    Jan 1, 1957

  • AUSIMM
    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Sep 13, 2010