Search Documents

  • NIOSH
    Short-Encapsulation Pull Tests For Roof Bolt Evaluation At An Operating Coal Mine

    By Stephen C. Tadolini, Steve Bessinger, James Pile, Christopher Mark

    The San Juan Coal Mine, located near Farmington, New Mexico, supplies the San Juan Generating Station with more than 6 million tons of coal annually. To replace dwindling surface mine production, San

  • AUSIMM
    Use of Remote Sensing Data to Aid Geological Mapping of the Waihi 1:50 000 Scale

    By R L. Brathwaite, S E. Belliss

    Linear and semi-circular features were mapped in the volcanic terrain of the southernCoromandel Peninsula, North Island, using JERS-1 synthetic aperture radar (SAR), Landsat-4 Thematic Mapper, and SPO

    Jan 1, 1994

  • SME
    Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

    By Brain E. Gombos

    The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary

    Jan 1, 2013

  • ABM
    Melhoria Da Qualidade Do Óxido De Ferro Produzido Na Regeneração De HCL

    By Jean Viana Bahia

    O óxido de ferro produzido nas Plantas de Regeneração de HCl da Usiminas, Usina de Ipatinga, é comercializado como coproduto para diferentes aplicações. Um dos requisitos de qualidade do óxido é o teo

    Aug 17, 2017

  • NIOSH
    RI 5946 The Performance And Operating Characteristics Of An Image Furnace Having 60-Inch Paraboloidal Mirrors ? Summary

    By Edwin E. Maust

    In response to the ever- increasing demand for high temperature materials, the Bureau of Mines instituted a program for the study and development of superrefractories, One of the major tools obtained

    Jan 1, 1962

  • NIOSH
  • IIMP
    Cut off y valorización de una veta

    By Rolando Luna B

    El presente texto señala las áreas operables y marginales de cada veta trabajada dentro de la mina a través de la limitación rentable y marginal durante y para la operación de la mina. Para ello, se d

    Aug 26, 1988

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • AUSIMM
    The Influence of Impurities on the Properties of Lead Part III

    The work to be described is part of a comprehensive research on the influence of impurities on the properties of lead. The author had previously compared an electrolytic lead containing less than 0.00

    Jan 1, 1934

  • NIOSH
    RI 3154 The Splicing of Rubber Sheathed Trailing Cables

    By A. B. Hooker, L. C. IlsLey

    "Observation of the use of trailing cables in ""mines shows that the chief limiting factor in the life of the cables and their safe use is the smashing or crushing of the cables in service, together w

    Mar 1, 1932

  • SME
    Detection of Subtle Sensor Errors in Mineral Processing Circuits Using Data-Mining Techniques Mining, Metallurgy and Exploration

    By Rambabu Pothina, Rajive Ganguli

    The economics of a mineral processing circuit is dependent on the numerous sensors that are critical to optimization and control systems. The sheer volume of sensors results in mines not being able to

  • SME
    Detection of Subtle Sensor Errors in Mineral Processing Circuits Using Data-Mining Techniques Mining, Metallurgy and Exploration (388248c9-1aa9-4f25-8e7c-bbfe8ed3e46e)

    By Rambabu Pothina, Rajive Ganguli

    The economics of a mineral processing circuit is dependent on the numerous sensors that are critical to optimization and control systems. The sheer volume of sensors results in mines not being able to

  • SME
    Peru Remains Committed to Its Mining Industry

    By Steve Kral

    Despite low commodity prices and mining industry cutbacks throughout the world, Peru remains one of the industry’s bright spots. The country’s remarkable economic turnaround during the 1990s remains

    Jan 1, 2000

  • SME
    On The Lateral Stiffness Of Gearless Mill Bearings

    By R. L. Guerguerian

    Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.

    Jan 1, 2000

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • SAIMM
    Improved SINTEF SiO-Reactivity Test

    By T. Lindstad, S. Gaal, S. Hansen, S. Prytz

    The SINTEF SiO-reactivity test, developed by Tuset and Raaness in the 1970?s, is a recognised method of characterising the ?reactivity? of carbonaceous reactants, used in the ferrosilicon and silicon

    Jan 1, 2007

  • ABM
    Desenvolvimento De Um Simulador De Temperaturas Dos Revestimentos Refratários De Um Forno De Aquecimento

    By Rafael Duclou Rito

    Com temperaturas altíssimas atingidas, os fornos são equipamentos responsáveis pelo aquecimento de materiais na produção de tubos sem costura. Assim, o investimento requerido de um forno em bom funcio

    Oct 30, 2017

  • CIM
    Sophisticated Ring Geared Mill Drives Features and Experiences

    By Maarten van de Vijfeijken, Marco Rufli

    "By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve the grinding process. Beside all the direct and indirect advantages, several dedicated

    Jan 1, 2011

  • SAIMM
    The Influence Of Pillars On The Merensky Reef Horizon On Stoping Operations On The Underlying UG2 Reef Horizon

    By N. Singh

    Merensky Reef is mined extensively within the Bushveld Complex. In previously mined-out areas on the Merensky Reef horizon there are pillars, potholes and remnants that have not been mined. These unmi

    Jan 1, 2005