Search Documents

  • SME
    Development and Status of the Treatment Technology for Acid Mine Drainage "Mining, Metallurgy & Exploration (2021)"

    By Shuangchun Yang, Le Tong, Ronggui Fan, Cunlei Li

    Acid mine drainage (AMD) is difficult to treat due to its physicochemical characteristics, such as high pH and high heavy metal concentrations, so it causes great harm to the environment and human hea

    Sep 4, 2020

  • AUSIMM
    Dynamic Testing of Combined Rock Bolt and Mesh Schemes

    By A G. Thompson, E Villaescusa, A De Zoysa, J R Player

    Ground support performance is critical to the safe and economical extraction of ore. This is particularly important for mass mining extractions at great depth, which are currently being considered by

    May 9, 2016

  • AUSIMM
    Bulk Density of Stratified Iron Ores and Its Relationship to Grade and Porosity

    By Wylie A. W, Mathew PJ

    Bulk density and grade were determined on a variety of ore samples from the Mount Tom Price iron ore mine and the interrelationship between these properties and porosity deduced.Variable porosity is r

    Jan 1, 1978

  • SME
    Observational Method Using Real Time Surface Settlement Monitoring On The South Toulon Tunnel Project - Introduction - Project History

    By B. C. Vargas

    The Toulon tunnel project is a key component of the Highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • ABM
    Simulação Computacional Da Carcaça Metálica Inferior Do Forno Elétrico A Arco Da Siderúrgica Sinobras S.a

    By Allison de Sá Barreto Ferreira

    O objetivo deste trabalho consiste em estudar o perfil térmico da carcaça metálica inferior do Forno Elétrico a Arco (FEA) durante o processo de produção de aço, sugerindo adição de aletas na geometri

    Oct 30, 2017

  • AUSIMM
    An Experimental Detailed Magnetic Survey by Light Aircraft

    From March to May of 1963, the Bureau of Mineral Resources carried out an experimental aeromagnetic survey at Cobar, New South Wales, to field test a proton-precession magnetometer installation in the

    Jan 1, 1964

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • AIME
    Producing – Equipment, Methods and Materials - The Skin Effect in Producing Wells

    By E. B. Brauer, W. Hurst, J. D. Clark

    Because of drilling, completion, and workover practices, the permeability around a wellbore generally is different from the permeability of the formation. The zone with the altered permeability is cal

    Jan 1, 1970

  • ABM
    Redução De Ocorrência De Trinca Nos Cilindros De Trabalho Do Trem Acabador Do Ltq-2 Da Csn

    By Luiz Alberto Pereira Campbell

    No processo de laminação a quente um dos fatores que afetam sua produtividade são os arrebentamentos de tira que ocorre no trem acabador, provocando paradas de longa duração, desvios de material e exp

    Aug 17, 2017

  • SME
    Modeling The Influence Of Slurry Temperature On Gold Leach And Adsorption Kinetics At The Fort Knox Mine, Fairbanks, Alaska

    By Eric M. Hill, Daniel E. Walsh, Hsing K. Lin, John T. Hollow

    The Fort Knox Mine is located in Alaska’s interior where the average ambient air temperatures range from -24°C in January to 16°C in July. The mill processes a free milling gold ore utilizing both a

    Jan 1, 2005

  • NIOSH
    IC 8122 Evaluating Raw Materials For Rotary-Kiln Production Of Lightweight Aggregate

    By Howard P. Hamlin

    This Bureau of Mines report is concerned with the testing procedures for evaluating clays, shales, and slates for lightweight aggregates using the rotary-kiln method of production. To meet the increas

    Jan 1, 1962

  • AUSIMM
    Re-Opening the Bullendale Mine

    Aurum Reef Resources is a provincially owned unlisted public company which holds a number of prospecting licences over Otago hard rock historically active minesites. The Bullendale Licence 31 1845 was

    Jan 1, 1992

  • ABM
    Efeitos Do Ciclo Térmico De Uma Determinada Rota De Manufatura Sobre Componentes Automotivos Fabricados Com O Material Din En 10149 S700mc

    By Daniel Angelo Zattera Milesi

    Em determinadas rotas de manufatura de componentes automotivos, principalmente de produtos do segmento rodoviário pesado, são muito comuns processos de desempeno a quente, assim como outros procedimen

    Aug 16, 2017

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • NIOSH
    OFR-19-77 Development And Design Of A Mine Roof Simulator - 0.0 Introduction - 0.1 Background

    By Klaus L. Cappel

    In 1972, the Bureau of Mines of the U. S. Department of the Interior commissioned the development and design of a Simulator for research and testing of mine roof supports used in long-wall mining. The

    Jan 1, 1974

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    BWARI Tunneling Underway

    By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert

    The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i

    Jan 1, 2005

  • TMS
    In situ Synthesis of Silicon-Silicon Carbide Composites from SiO2-C-Mg System via Self-Propagating High Temperature Synthesis

    By Sutham Niyomwas

    Silicon-Silicon Carbide (Si-SiC) composites were synthesized by self-propagating high temperature synthesis (SHS) from a powder mixture of SiO2-C-Mg. The reaction was carried out in a SHS reactor unde

    Jan 1, 2009

  • CIM
    SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future Operations

    By Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius

    "The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role

    Jan 1, 2007

  • IIMP
    Sistematización y modelamiento para el diseño y evaluación de disparos

    By Gualberto Salas

    Dado que la voladura es una de las operaciones unitarias de mayor extracción del mineral -en tanto logra una adecuada fragmentación de la roca con un costo reducido, es necesario lograr una interrelac

    Sep 13, 2001