Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Fortrac® Geogrids For Mine Roof Control

    By Ray Brandon

    The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid

    Jan 1, 1996

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME-ICGCM
    Applications Of Probabilistic Analysis In Mine Ground Control

    By Gang Chen

    Conventional methods designate a factor of safety, a deterministic number, to indicate the stability of a mine excavation. However, this deterministic description of excavation stability is frequently

    Jan 1, 1996

  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    In-Seam Seismic Tomography Mapping Application To Coal Mining Problems

    Continuing with the effort of providing new and more effective exploration methods to the mining industry, where direct methods (drilling, cross-cutting, etc.) are not applicable, either for logistica

    Jan 1, 1996

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME-ICGCM
    Think Like a Roof Bolt ? Then Make It Scream ?

    By Greg Smith

    This paper documents the use of bench testing equipment developed to enhance the understanding of, and improve upon, common roof bolt support systems. Most roof bolt systems consist of components that

    Jan 1, 2012

  • SME-ICGCM
    Theoretical analysis of breaking strength of mine pillars and test specimens

    By D. S. Choi

    This paper presents a theoretical analysis of the effect of shape and size on strength of geologic materials. The results indicate that the shape effect is caused by the development of confining press

    Jan 1, 1989

  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?

    By Dan Payne

    The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo

    Jan 1, 2008

  • SME-ICGCM
    The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design

    By Thomas M. Barczak

    The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a

    Jan 1, 1987

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984