Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Co-designing the future: Integrating social transition and compliance for sustainable mine closures
By O. Koatlhai
Mine closures have traditionally prioritised environmental rehabilitation, often overlooking the deep socio-economic disruptions that follow, particularly in mining-dependent communities. This paper a
Apr 25, 2025
-
A Rapid Method of Calculating Temperature Increases Along Mine Airways
By A. M. Starfield
Discussion J. de V. Lambrechts (Fellow): The author's paper is a brilliant follow-up of an earlier paper by Starfield and Dickson.1 I have no quarrel with Dr Starfield's computerization of
Jan 11, 1969
-
The Giant Kamoa—Kakula Project in the Democratic Republic of Congo
By B. Matsetela, S. Amos, V. Nkuna
"The Kamoa-Kakula copper project—a joint venture between Ivanhoe Mines, Zijin Mining Group Co. Ltd, and the government of the Democratic Republic of Congo—has been independently ranked as the world's
Nov 1, 2018
-
The South African mining royalty regime: Considerations for modifying the system to balance its competing objectives
By P. O. Akinseye, F. T. Cawood
Mineral royalties are one of the oldest forms of mining taxation, and were initially introduced to extract economic rents from mining. Over time, the royalty regime has become more complex as it was i
Dec 1, 2021
-
The Influence Of N On Hot Ductility Of V-, Nb-,And Nb-Ti- Containing Steels Using Improved Thermal Simulation Of Continuous Casting ? Synopsis
By K. M. Banks
The hot ductility of in situ melted tensile specimens of micro-alloyed steels having C contents in the range 0.12?0.17% (mass %) have been examined over the 700?1000°C temperature range. An improved t
Jan 1, 2011
-
Proceedings October General Meeting (d93358e7-0eb7-4797-b435-a76cf6975c57)
The October General Meeting of the Institute was held in Kelvin House, Johannesburg, on Wednesday, 21st October, 1970, at 4.30 p.m. V. C. Robinson (President) was in the chair. There were also p
-
The application of Baleen Filter microscreening technology at BECSA?s South Export Plant
By S. Tshikhudo
This paper outlines an investigation into the recovery of saleable fractions of coal from ?as-arising? South Export Plant effluent streams, using Baleen microscreening technology. South Export Plant,
Jan 1, 2014
-
Engineering Principles for the Design of a Personnel Transportation System
By G. M. J. van Heerden, R. C. W. Webber-Youngman
"This article describes the re-engineering principles applied in the design of a personnel transportation system for the Bafokeng Rasimone Platinum Mine in the Rustenburg area of South Africa. It inco
Jan 1, 2016
-
Multivariate Resource Modelling For Assessing Uncertainty In Mine Design And Mine Planning ? Synopsis (ba3d1ca9-d905-4b9a-85ef-6112346fbb70)
By C. Montoya
This paper shows, through a case study, the impact of multivariate grade modelling upon mine design and mine planning. A deposit explored by drill holes is considered, in which the grades of five elem
Jan 1, 2012
-
Communication constraints in the safety system on South African mines and implications for the exercise of the Right to Refuse Dangerous Work
By N. Coulson, P. F. Stewart
The Mine Health and Safety Act No. 29 of 1996, as amended, embeds an occupational health and safety management system that facilitates communication between representatives of the state, capital, and
Apr 14, 2024
-
Insights into the Potential for Reduced Refractory Wear in Silicomanganese Smelters
By J. D. Steenkamp, J. Muller
"Excavation of an industrial-scale submerged arc furnace, utilized in the production of silicomanganese, identified two high-wear areas in the refractory lining: the tap-hole, built with cold rammed c
Jan 1, 2016
-
The control of milling circuits
By A. L. Hinde, P. J. D. Lloyd, A. R. Atkins, J. G. MacKay
The control of milling circuits by A. R. ATKINS, M.Se. (Elee. Eng.) (Visitor), A. L. HINDE, S.Se., Ph.D. (London) (Visitor), P. J. D. LLOYD, S.Se. (Chem. Eng.), Ph.D. (Cape) (Fellow) and J. G. MACKA Y
Jan 6, 1974
-
Integrated Short- And Medium-Term Underground Mine Production Scheduling - Synopsis (01060c16-86e0-4e0e-8e87-e1ba1c275054)
The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob
Jan 1, 2012
-
Alpha Case Formation Mechanism In Ti-6Al-4V Alloy Investment Castings Using YFSZ Shell Moulds - Synopsis
By A. M. Bauristhene
Ti-64, which accounts for more than 50% of the worldwide titanium tonnage, has found commercial importance in industries requiring components with high specific strength and resistance to corrosion. I
Jan 1, 2013
-
Parametric Estimation of Capital Costs for Establishing a Coal Mine: South Africa Case Study
By C. Musingwini, M. Mohutsiwa
"SynopsisCapital cost estimates are important in decisions on whether a project will be approved, mothballed, or abandoned. In South Africa, junior coal miners do not have extensive databases of histo
Jan 1, 2015
-
Sustainable Issues Related To Heap Leaching Operations - Synopsis
By J. F. Lupo
One of the earliest records of metal recovery by solution leaching is described by Agricola as 'juice of rock' in the 1550s. In these early years of hydrometallurgy and civil engineering, fe
Jan 1, 2012
-
Corrigendum: February Issue
Fig. 4 and 5 of the paper 'The analysis of ventilation and cooling requirements for mines' by J. van der WaIt, E. M. de Kock, and L. K. Smith are positioned incorrectly in the February issue
Jan 1, 1983
-
Author reply
To B. K. Martus I discussed several points raised by Mr Martus in my reply to Professor Krige*. Mr Martus discusses several possible interpretations of optimum South African sales, but in my paper the
Jan 1, 1984
-
Feasibility studies of the on-stream analysis of lead in mineral slurries
By S. K. Kawatra
Feasibility studies of the on-stream analysis of lead in mineral slurries by S. K. KAWATRA. P. Eng. (Canada). Ph.D. (Australia). M.Sc. (India) (Visitor) Instruments for the measurement of lead in mine
Jan 8, 1976
-
A comparison of electric smelting on pilot and industrial scale
By H. Skretting, J. Gundeesen
The paper compares operational parameters for the electric reduction smelting of pig iron and ferroalloys in pilot and industrial furnaces. Data from two pilot furnaces of approximately 200 and 500 kW
Jan 1, 1979