Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improving Explosives User Safety by Introducing Regulation Awareness Training

    By L. A. Heim, E. A. McCullough, N. J. Amiotte

    The explosives industry is subject to the laws of multiple jurisdictions, which means that several regulatory agencies are responsible for governing different aspects of the commercial explosives indu

    Jan 1, 2014

  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Testing of a New Blasting Mat Constructed Using Rubber Tractor Treads

    By Matthew K. Coy, Paul N. Worsey

    The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea

    Jan 1, 2015

  • ISEE
    Large Scale Measurement of Velocity of Detonation

    By Alastair Torrance, Braden T. Lusk, MinGi Seo, Gary Cavanough

    Velocity of Detonation (VOD) is the most commonly used method to determine explosive performance as VOD is a function of the confinement (ground conditions) density and composition of the explosive. T

    Jan 1, 2019

  • ISEE
    Unlocking the Wealth From Benefit Sharing in Drill and Blast

    By Lawrie Logan, Mike Wiggin

    This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen

    Jan 1, 2001

  • ISEE
    A Study on the Correlation Between Delay Time and Fragmentation

    By Yeon-Ho Jin, Eui-Haeng Heo, Yun-Seok Park, Sung-Oong Choi, Hyung-Dong Min, Min-Su Jeong, Seung-Joong Lee

    As rock fragmentation in bench blasting can affect the following process such as loading, hauling and crushing, its good control is essential for assessment of blasting efficiency and production cost.

    Jan 1, 2015

  • ISEE
    Real Life Considerations in Vibration Damage Criteria and Measurement

    By Derek Morris, Vito Saccheri

    In the monitoring of seismic exploration (whether by explosive or vibratory energy sources), the intensity of shaking at neighboring structures can now be measured quite accurately and comprehensively

    Jan 1, 2009

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    Safety in Blasting Has No Limits

    By W C. Brukle

    Our title for this presentation could be taken in many ways. One course would be terrifying and that would be to cite incredibly bad practices. All of our votes/efforts should be for the reverse direc

    Jan 1, 1983

  • ISEE
    Detection of Geological Features using Aerial Image Analysis and Machine Learning

    By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja

    Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst

    Feb 1, 2020

  • ISEE
    Blast Noise Annoys

    By David E. Siskind

    Increased mineral consumption and environmental concern have caused much interest in potential damage and annoyance from ground vibration and airblast produced by production blasting in surface mines

    Jan 1, 1977

  • ISEE
    Rock Removal Techniques and Equipment in Trench Excavation and Pipeline Construction. A Comparison

    By Benedict C. Di Duca

    In the underground construction industry. when bidding work, not only is the contractor faced with determining if rock: is in existence within the parameters of his work. he must also estimate the qua

    Jan 1, 1990

  • ISEE
    Seismic Monitoring During Blastings of Building Pit for WTC at Rijeka

    By D Vrkljan, Z Ester

    Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m3 of hard mass in fused condition. The building pit is located at a densely populated residenti

    Jan 1, 1999

  • ISEE
    Coupled Rock Motion and Gas Flow Modeling in Blasting

    By Steven D. Knudsen, Dale S. Preece

    The spherical element computer code DMC (Distinct Motion Code) used to model rock motion resulting from blasting has been enhanced to allow routine computer simulations of bench blasting. The enhancem

    Jan 1, 1992

  • ISEE
    Trial Study--Self Consuming Detonators to Reduce Ore Contamination

    By Kurt B. Oakes, Brian M. Fortelka

    Unimin Corporation operates an underground Silica Sand mine at Guion, AR located in North Central Arkansas. The Silica Sand deposit at Guion is part of the St. Peter Sandstone Formation, which is over

    Jan 1, 1999

  • ISEE
    MSHA Regulations and Bom Research Program on Multiple Short-Delay Blasting of Coal

    By J Edmund Hay, Harry C. Verakisl, Richard J. Mainiero, John J. Mulhern

    As the first stage in the rulemaking process, MSHA prepared requirements for the approval and use of permissible explosives and blasting items in underground coal mines. These draft requirements known

    Jan 1, 1985

  • ISEE
    Controur Control blasting in Soft Rock Excavation

    By W. Jiao, Y. Yongqi, R. Shan

    Soft rock mines are distributed through out P.R.C. And drilling and blasting is still the main method of driving a tunnel in these mines. Traditional smooth blasting has been widely and deeply studied

    Jan 1, 2000

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    Seismic Waves caused by Reinforced Concrete Decks impacting the Ground

    By Andrea Francioso, Roberto Folchi

    In order to comply with the latest European Highway Standards, the highway Salerno - Reggio Calabria, in southern Italy, had do be widened and upgraded to reduce its vulnerability to earthquakes. Rein

    Jan 1, 2013

  • ISEE
    Diagnosis of Utility Pipelines' Response to Explosives using Modal Analysis

    By Selamawit Asfaw, Mohamad Sharif

    In recent years, the use of modal analysis has increased to include many different aspects of the construction industry. Computer modal analysis can be used in determining the dynamic properties of a

    Jan 1, 2000