Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting to Initiate Block-Caving in Serpentine

    By Terry Matts, Henry Heidrich, Cluny Randell, Carl Kottmeier

    Until 1990, all production of asbestos ore at Cassiar was by open-pit methods. With the impending exhaustion of open-pit reserves, a decision was made in February 1988 to continue mining underground,

    Jan 1, 1992

  • ISEE
    Rock Stitching Coupled with Controlled Blasting - A Cast Study

    It is a case study of huge rock-mass, loosened out from the parent rock-body, & posing a potential danger to structures down below the slope on which this rock mass was standing. Case was dealt in two

    Jan 1, 1997

  • ISEE
    Should Blasthole Subdrilling be Loaded with Explosives

    By Norman S. Smith, Troy D. Harris, Richard L. Ash

    In open-cut bench blasting drilling boreholes below grade level is normally considered essential to insure toes do not remain. The extra drilling and use of explosive below floor level are not only ex

    Jan 1, 1978

  • ISEE
    Utilization of Pre-split to Dewater a Cut

    By Monica Stuckert

    Field studies were made at an Appalachia coal stripping operation to evaluate the differences in cost and performance between blast casting with pre-split dewatering versus conventional coal overburde

    Jan 1, 1985

  • ISEE
    Lubrication of Rotary Rock Bits

    By J MacPhail, H Gardner

    This paper discusses reasons why users of rotary air blast hole bits encounter premature bit failure due to bearing failure. It also discusses a lubrication system designed for rotary rock bits to com

    Jan 1, 1996

  • ISEE
    Assessment and Mitigation of Ground Vibrations and Flyrock at a Limestone Quarry

    By R M. Bhatawdekar, A I. Theresraj, H S. Venkatesh

    Wadi Limestone Quarry is one of the largest captive mines of Associated Cement Companies Ltd, India. The mine management wanted to extend the excavation as close to the plant as possible for maximum e

    Jan 1, 1999

  • ISEE
    A Multiple Deck Burn Round for Shaft Sinking

    By Thomas L. Barkley

    This paper describes an unusual design for a 12 foot diameter, 30 foot deep circular shaft shot in a close in urban environment less than 100 feet from occupied structures. It uses diagrams, video foo

    Jan 1, 1994

  • ISEE
    Environmental Concerns of the Blasting Industry

    By Thomas E. Brown

    With the ever increasing public sensitivity to our environment, the blasting industry can no longer be concerned with just drilling and blasting. Government regulations, augmented by public pressure,

    Jan 1, 1995

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996

  • ISEE
    The Development of a New Cable Cutting Device

    By Richard B. O'Meara

    "The demand by a customer to an Explosives supplier to fulfill a specialised productrequirement was met by a level headed decision to try to satisfy that demand. This paperwill describe the fundamenta

    Jan 1, 1993

  • ISEE
    Optimum Design Features of Controlled Trajectory Blasting (CTB)

    By T N. Hagan

    Where explosion energy moves rock from the in-situ to its desired location without considerable assistance from digging and/or hauling equipment, good fragmentation is of minor importance. Maximum dis

    Jan 1, 1979

  • ISEE
    Drilling and Cost Analysis Usign a Personal Computer and Spreadsheet

    By William D. Hissem

    The purpose of this paper is to advise people about the methods, use, and possible applications of current "personal computer" hardware and software with regard to the economic cost analysis of percus

    Jan 1, 1986

  • ISEE
    A Review of Airblast-Induced Window Breakage

    By Bruce B. Redpath

    This paper reviews empirical and analytical information about window breakage due to airblast. As is the case with damage to structures caused by ground vibrations, a fixed break/no break threshold is

    Jan 1, 1976

  • ISEE
    Importance of Straight Hole Drilling

    By Stephen Hamilton

    This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst

    Jan 1, 1999

  • ISEE
    Development of Heat Resistant Emulsion Explosives

    By Fumihiko Sumiya, Koichi Kurokawa, Yukio Kato, Tetsuya Sawada

    In some metal mines, it is a serious problem the decomposition of explosives which occurs suddenly by contact with ore containing pyrites under high temperature conditions. In the present paper, we in

    Jan 1, 1992

  • ISEE
    Improper Spacing; a Major Problem with Surface Blasting

    By Richard L. Ash, Calvin J. Konya

    Proper selection of the spacing distance between blastholes is fundamental to successful blasting. Its value directly affects the profitability of an operation. It also exercises control over adverse

    Jan 1, 1979

  • ISEE
    What Every Defense Lawyer Wished his Blasting Company Clients Knew

    By Jay P. Tobin

    This paper will address the legal standards applicable to construction blasting lawsuits and offer best practices suggestions for pre-blast inspections, documenting the construction blasting work, rec

    Jan 1, 2015

  • ISEE
    The Application and Economics Benefits of Blasthole Drill Monitors

    By John F. Vynne

    This paper will discuss the application of available monitoring technology on blasthole drills with the goal being to reduce costs and increase productivity. Case studies from the monitoring of blasth

    Jan 1, 1997

  • ISEE
    Deep-hole Controlled Blasting in Reconstruction Railway Cutting

    By He Guangyi

    During rock blasting in extending deep cutting from Jiu Li Mountain to Dong Zhuang Village in Jiao Zhi Railway line, we have drilled deep hole with large scale diving drilling machine and successfully

    Jan 1, 1997

  • ISEE
    Wall Control Methods Developed at Central Pennsylvania Surface Coal Mining Operations

    By C Jamie Kridler

    "An increased concern for pit safety and more stringent, highwall requirements for augermining of final cuts has led to a new emphasis on wall control for a Central Pennsylvaniacoal operator. Over the

    Jan 1, 1993