  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
  • DFI
    To Protect Pit-Wall By Means Of Chemical Grouting In Excavation Work Of Deep Foundation Pit

    By Xiong Houjin

    In the excavation works of some deep foundation pits within the boundaries of Guang­dong Province of China, though some measures, such as steel sheet piles, diaphragm walls, etc. were taken to protect

    Jan 1, 1991

  • DFI
    Numerical Analysis of Pile-Supported T-Walls Subject to Large Settlements and Flood Loading

    By Alexander B. Reeb, Richard J. Varuso, George M. Filz, Jehu B. Johnson

    "T-walls, which are concrete floodwalls in an inverted “T” shape, are an integral component of the Greater New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS). In order to resist lar

    Jan 1, 2017

  • DFI
    Experiences With A New Type Of Displacement Screw Pile - Synopsis

    By William Van Impe

    A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a

    Jan 1, 1996

  • DFI
    Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction

    By R. G. Horvath

    In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h

    Jan 1, 1987

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • DFI
    The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation Construction

    By Li Huimin

    In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu

    Jan 1, 1991

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • DFI
    6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway

    By Aly M. Mohammad

    The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h

    Jan 1, 2002

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? Synopsis

    By D. Goossens

    Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the

    Jan 1, 1996

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    New Technologies For Quality Control Of Augered Cast-In-Place Piles

    By Tracy Brettmann

    In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r

    Jan 1, 2000

  • DFI
    Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction

    By Michael W. Neill, O&apos

    The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec

    Jan 1, 1989

  • DFI
    Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, Vietnam

    By Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen

    "Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and

    Jan 1, 2015

  • DFI
    Prediction And Performance Of Drilled Shafts Constructed Under Slurry

    By Clyde N. Baker

    The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res

    Jan 1, 1991

  • DFI
    Performance Of Three Unique Shoring Sections For Block 75 Shoring

    By Chris Sammon

    The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet

    Jan 1, 2010

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2013