Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • DFI
    Session IV - Notable International Projects - Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:

    By Wolfgang G. Brunner

    The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine

    Jan 1, 2000

  • DFI
    Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction

    By Timothy L. Roberts

    For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary

    Jan 1, 1998

  • DFI
    Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against Liquefaction

    By Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa

    "Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me

    Jan 1, 2014

  • DFI
    Excavation Support At Historic Buildings In An Urban Environment - A Case Study

    By Tony Mazzo

    It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine

    Jan 1, 2003

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    Disconnected Piled Raft Foundations Performance (DCPRF) With Cushion

    By Saeed Salehi Malekshah

    In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen

    Jan 1, 2011

  • DFI
    "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."

    By Alexander J. Verstraeten

    Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de

    Jan 1, 1987

  • DFI
    Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
    Development and Experiences on Versatile Applications of RD-pile Wall

    By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen

    "Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist

    Jan 1, 2014

  • DFI
    Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction

    By Michael W. Neill, O&apos

    Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in

    Jan 1, 1991

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • DFI
    Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • DFI
    Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is

    Jan 1, 2002

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005