Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Behavior of Hydrogen in an Al-Zn-Mg Alloy Investigated by Means of Hydrogen Microprint Technique

    By G. Itoh, S. Fukasawa

    The Al-Zn-Mg alloys have been known to be susceptible to stress corrosion cracking (SCC), which is based on intergranular cracking arisen from hydrogen embrittlement (HE). The mechanism of HE has not

    Jan 1, 2015

  • CIM
    Raise Boring at The International Nickel Company of Canada,• Limited, Ontario Division

    By W. J. Taylor, T. D. Parris

    "Over 90,000 feet of raise have been bored at International Nickel underground mining operations throughout the Sudbury District since the advent of raise boring in the early part of July, 1964. With

    Jan 1, 1972

  • CIM
    Rehabilitating Lower Levels, Beattie Mine

    By W. W. Bake

    INTRODUCTION IN IN JUNE, 1943, the main pillars of the Beattie Mine glory hole failed, allowing over a million yards of wet clay and debris to flow into the mine, completely filling all workings to w

    Jan 1, 1951

  • CIM
    Cemented Sand Fill at lnco

    By J. McCreedy

    "The addition of Portland cement to hydraulic sand fill has resulted in the production of stable and self-supporting cemented sand fill. The use of cemented fill in the mines of The International Nick

    Jan 1, 1966

  • CIM
    Mettop Process Control and Regulation System

    By I. Filzwieser, A. Filzwieser

    The Peirce Smith converter is the key metallurgical vessel in the majority of copper smelters. During the two step process, oxygen enriched air is injected through a row of tuyeres into the matte rece

    Jan 1, 2007

  • CIM
    Exploration techniques for sand and gravel

    By D. F. VanDine

    The phases of a typical exploration program for sand and gravel resources include: (1) collection and assessment of existing information; (2) air photo interpretation and remote sensing; (3) ground in

    Jan 1, 1984

  • CIM
    Forward Osmosis for Industrial Process Water Recovery: The Case of TMA-CO2-H2O as Draw Solution

    By V. G. Papangelakis, T. Clark, G. Kolliopoulos

    Sustainability of the hydrometallurgical industry requires the development of processes for effective water recovery; if process water is recovered and recycled, fresh water intakes will be reduced. F

    Jan 1, 2015

  • CIM
    Faster Analysis: Recent Advances in GEOSCAN on-Belt Analysis Techniques Allowing for Rapid Real-Time Measurement of Minerals

    "Real-time, on belt analysis of minerals is becoming increasingly important and critical in modern operations, especially in the mine-to-mill. Prompt gamma neutron activation analysis has long been ut

    Jan 1, 2017

  • CIM
    The Change in Operating Philosophy after Converting the Comminution Circuit from a Single Stage Sag Mill to a SAG/Ball Mill Circuit – The Tarkwa Experience (300ae6fa-a4d4-4788-9f6d-d7c721c2548d)

    By J. O. Yeboah, V. Boakye, P. A. Bepswa, M. Lombard, G. Nutor

    The comminution circuit at Tarkwa Gold Mine was commissioned as a Single Stage SAG mill operated in closed circuit with hydrocyclones designed to process 4Mtpa. The circuit was later expanded by addin

    Jan 1, 2012

  • CIM
    Universal Kriging For Ore-Reserve Estimation- Conceptual Background and Application to the Navan Deposit

    By N. W. D. Davis

    "As I have recently carried out some further research on the Navan lead-zinc deposit data while working in Michel David's research team, I should like to add a few comments on the paper- ""Universal K

    Jan 1, 1976

  • CIM
    Effect of Ammonia Addition on the Crystallization of Ammonium Para-Tungstate (Apt) in the Extraction Process

    By J. H. Pee, Y. J. Kim, H. U. Lee, G. H. Kim

    The general recycling process of tungsten scrap to produce tungsten raw materials (tungstic acid, ammonium paratungstate (APT) and WO3) have been carried out by the oxidation, milling, sodium-fusion,

    Jan 1, 2015

  • CIM
    Mining Contractors – A Necessary Evil or An Increasingly Valuable Service to the Industry?

    By James S. Redpath

    "AbstractThis paper is an attempt. to outline the present status of underground mining contracting in Canada, and to present certain facts concerning the writing and administration of underground mini

    Jan 1, 1977

  • CIM
    The National Advisory Committee on Research in the Geological Sciences

    By J. F. Henderson

    "IntroductionTHE National Advisory Committee on Research in the Geological Sciences was set up by the Privy Council of Canada in 1949. It was set up because you, the Geology Division of the Canadian I

    Jan 1, 1952

  • CIM
    Metallurgical Research in Canada: A Symposium

    "ALTHOUGH Canadian metallurgists have long been active in research, the scope of the work was somewhat limited until the be-ginning -of World War II. The rapid industrial development of Canada during

    Jan 1, 1952

  • CIM
    The Influences of Interrupted Quenching on the Natural Aging and Bake Hardening of Al-Mg-Si Alloys

    By Zhiqing Zhang, Changyun Chen, Qing Liu, Lin Lin, Zhihong Jia, Guangjie Huang, Lipeng Ding

    The effect of interrupted quenching (IQ) treatments on natural aging and bake hardening response of Al-Mg-Si alloy was investigated by hardness measurements, tensile test, differential scanning calori

    Jan 1, 2015

  • CIM
    Gold Solubility in Smelting Slags for the Recycling of Industrial and Mining Wastes

    By Joo Hyun Park, Hyun-Sik Park

    "Gold is one of the most valuable and precious metals. But, the extraction efficiency of gold from natural resources is very low and labor-intensive due to very low concentration of gold, i.e.,1–5 ppm

    Jan 1, 2017

  • CIM
    Use of Forced Post-Combustion in Feni Laterite Smelting Furnaces

    By H. Oterdoom, S. Pilger, T. P. Bui, J. Rotarius

    "Most FeNi furnaces used to rely on post-combustion and off-gas cooling inside the furnace to eliminate the produced CO gas, and control the off gas temperature. As furnace load, capacity, and thus ga

    Jan 1, 2017

  • CIM
    Polarographic and Amperometric Methods Applied to Metallurgical Analysis*

    By A Hitchen

    A general outline is given for the determination of copper, nickel, cobalt, zinc, lead, cadmium, bismuth, manganese, uranium, molybdenum, vanadium, sulphate and fluoride by polarographic or amperometr

    Jan 1, 1965

  • CIM
    Kupol Mill Leach Operation In 2008-09

    By G. Kolosay, J. Rajala, G. Deschênes, A. Romanov

    ABSTRACT: The Kupol project, located in Far East Russia, treats a high-grade, free-milling ore containing 25.5 g/t Au, 298.3 g/t Ag, and 0.5% pyrite,with a P70of 53 microns. Most of the gold occurs as

    Jan 1, 2011

  • CIM
    Toward Optimum Value in Underground Mine Scheduling

    By P. G. Dunn, J. Fitzgerald

    ABSTRACT The scheduling of underground mining activities is a complex task that must simultaneously satisfy a large number of constraints. A schedule optimization tool (SOT) for underground mine plann

    Jan 1, 2010