Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Data mining in rock mining – predicting mechanical properties of carbonate rocks using hyperspectral remote sensingBy E Ben-Dor, D Bakun-Mazor, Y Ben-Ari
Determining the mechanical properties of rocks is important for various civil engineering fields, including the mining of raw materials for aggregates used in the construction and paving industries. T
Nov 29, 2022
-
BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and FutureBy M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken
"BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to
Sep 29, 2013
-
Mine Ventilation Model Validation - ItÆs not Rocket Science!By J Rowland
"Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil
Jun 1, 2012
-
Diesel Exhaust and the Underground Miner in Western AustraliaBy O Jones
Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and
Aug 31, 2015
-
An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore finesBy T Walkemeyer, R Elliott, D Chang-Martin
Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins
Sep 18, 2023
-
Mineral Prospectivity of the Middle Devonian Dulladerry Volcanics, Central-West New South WalesThe middle-Devonian Dulladerry Volcanics is a complex of A-type, predominantly rhyolitic ignimbrites, lavas and breccias. They form a NNW trending belt some 90 km long and 10-20 km wide, east of Par
Jan 1, 1995
-
Geotechnical Models and Data Confidence in Mining Geotechnical DesignBy M J. Dunn
The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l
Nov 5, 2014
-
Machine learning in resource geology – why data quality is criticalBy P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook
Consultants in the mining industry have the opportunity to visit interesting deposits all over the world. Each deposit has its own set of challenges to face when it comes to defining and understanding
Mar 22, 2022
-
Mineral project risk and orebody knowledge – quantifying the value of drilling using decoupled net present value analysisBy D Espinoza, I Rees, J Pocoe, P Collier
P Collier, I Rees, J Pocoe and D Espinoza
Mar 22, 2022
-
Mitigation of Post-blast Fume in Soft Ground and Wet ConditionsBy S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri
Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric
Aug 24, 2015
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Comparison of risk register quality and consistency using causal network topology analysisBy Y Lin, B J. Seligmann, M Hassall, S Micklethwaite
For multi-site mining companies, checking the quality and consistency of the data recorded in risk registers is important for confirming how well mine safety management systems have been implemented.
Apr 16, 2024
-
Leaching of Mt Weld Phosphate Ores with Acetone-water-SO2 MixturesBy Lee Y. K, Walker G. S, Bronswijk V. W
The effect of leaching three samples of Mt Weld ore with a-hydroxysulphonic acid [(CH3)2(COH)SO3H] was assessed. Apatite present in the samples was found to be readily soluble but calcination up to
Jan 1, 1991
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Reducing ventilation change downtime and increasing operational uptimeBy J A. Rowland
When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during
Oct 12, 2022
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumptionBy A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins
Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy
Sep 1, 2024
-
Tunnel Boring Machine Usage Speeds up Development at Stillwater MineBy D Willis, A Shanahan, C Jacobs, T Luxner
The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin
Sep 17, 2014