Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Wind Blasts in Underground Coal Mines: A Study of the Effect of the Rock Mass Properties of the Falling Roof Using a Physical Model

    By Torabi S. R, Daly C. R

    Wind blast is the sudden movement of air displaced by the massive collapse of roof rock in underground openings and is experienced as a high velocity flow of air through adjacent workings. The initi

    Jan 1, 1995

  • AUSIMM
    The Ernest Henry Mine Project - "The Mining Cycle"

    By T Amiconi

    Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro

    Jan 1, 1998

  • AUSIMM
    The Development and Application of Long Round (Six Metre) Technology in South African Shaft Sinking Practice

    This paper deals briefly with productivity-enhancing advances in shaft sinking technology in South Africa post-World War II in general and the developments and application of long rounds since the 198

    Jan 1, 2002

  • AUSIMM
    Adsorption Phenomena and Kinetics of Gas Liquid Iron Reactions

    The influence of strongly chemisorbed solutes such as oxygen and sulphur on the rates of reactions at the gas-liquid iron interface is briefly reviewed. Deductions from recent studies of the rates

    Jan 1, 1980

  • AUSIMM
    A Review of Recent Developments in the Process Mineralogy of Gold

    In reviewing recent developments in the process mineralogy of gold it is convenient to distinguish between visible (>0.1 pm) and invisible gold (1 - 2 pm in size in polished section; these can scan

    Jan 1, 1992

  • AUSIMM
    On-Stream Analysis of Iron Ore and Its Potential for Improving Export Quality Control

    An on-stream iron ore analyser has been developed in collaborationwith Hamersley Iron Pty. Limited for determining the iron content ofboth lump (- 30+ 6 mm particle size) and fines ( - 6 mm particle s

    Jan 1, 1988

  • AUSIMM
    Review of the Cut and Fill Method of Underground Mining

    By Thompson IR, Solomons SS

    Underground mining with the cut and fill method has been declining during the past decade or so, being replaced mostly by sublevel open stoping methods. During 1983 the Australian Mineral Industries R

    Jan 1, 1985

  • AUSIMM
    Kiruna Iron Ore Mine - Operations Today and Plans for the Future

    The difficulty in creating and obtaining a competitive edge in the mineral industry is rapidly increasing. The Kiruna Iron Ore Mine in the far north of Sweden is currently thriving on the world mark

    Jan 1, 1997

  • AUSIMM
    Computer Based Design of Rehabilitated Strip Mine Landforms

    By Roe P, Lowell A

    This paper outlines software development and design work carried out by Mincom Pty Ltd in collaboration with Capricorn Coal Management (CAPCOAL) for computer based design of rehabilitated strip min

    Jan 1, 1991

  • AUSIMM
    Developments in Mineral Processing Technology

    By Greenhalgh L. P H

    The opportunities offered by an increasingly volatile world invite the international consultant or engineering services contractor to broaden attitudes, diversify interests, expand capabilities, retai

    Jan 1, 1993

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    An Expiremental Investigation on Cable Reinforcement

    By Fabjanczyk MW, Aziz NI, Hii J

    The paper presents the results of a series of pull out tests performed on roof reinforcement systems currently being adopted in mines in Australia 7mm wire, dividag bar, 15.2mm strand cable, and b

    Jan 1, 1986

  • AUSIMM
    Predicting Machine Cutting and Cutter Wear Rates for Mining Applications

    By Trueman R

    If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi

    Jan 1, 1995

  • AUSIMM
    Microseismic Monitoring for Gas Outbursts at Leichhardt Colliery

    By Ahmed M, Leung L

    A program of microseismic noise monitor ing for gas outbursts, in conjunction with other mining engineering measurements and observations, is being undertaken at Leichhardt colliery in Queensland.

    Jan 1, 1980

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985

  • AUSIMM
    Resource and Reserve Calculations - The Experience at BHP-Utah Coal Limited

    The process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o

    Jan 1, 1990

  • AUSIMM
    Parameter Adaptive Modelling of Mineral Beneficiation Processes

    Data logged on mineral beneficiation processes during normal operation are analysed using time series (correlation and spectral) methods to identify the dynamics of the processes for on-line computer

    Jan 1, 1985