Search Documents

  • AUSIMM
    Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)

    By Misra V. N, Cheng C. Y

    Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i

    Jan 1, 1999

  • AUSIMM
    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Sep 13, 2010

  • CIM
    Equity Silver Mines Scavenger Circuit

    By P. G. Semple

    "In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t

    Jan 1, 1987

  • AUSIMM
    The Failure of Lead by Creep

    From time to time lead, which is normally considered to be a soft ductile metal, fails by cracking. The cracks which form appear to be of two distinct types-(a) those which follow a zig-zag course aro

    Jan 1, 1935

  • CIM
    Assessing the Value of Ventilation on Demand CIM Conference

    By Glenn Lyle

    CEMI Introduction ? Introduction of the CAF VOD Project ? Who are our partners ? What were the Outcomes What is next

    May 1, 2011

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • NIOSH
    IC 6898 Costs Of Trucking And Packing Ore In Western Gold-Mining Districts ? Introduction

    By E. D. Gardner

    Ore and concentrate are transported on, the surface at western mining districts by (1) railroads, (2) surface trams, (3) aerial trams, (4) trucks, and (5) wagons, and (6) on the backs of animals. T

    Jan 1, 1936

  • SAIMM
    Q-coda estimation in the Kaapvaal Craton

    By D. Grobbelaar, A. Cichowicz, D. J. Birch

    The Q-coda method for estimating the quality factor Q(f)= Qo(f)n was used to characterize seismic wave attenuation in a region of the Kaapvaal Craton that includes the mining areas of the Bushveld Com

    Jan 1, 2015

  • SAIMM
    Mechanical–transport processes in salt: consequences for abandonment of underground exploitations

    By M. Ghoreychi, X. Daupley

    ABSTRACT: The paper is devoted to two major aspects related to the abandonment of salt mines: 1)- Long-term risk associated with the mechanical instability of surface and its consequences for public s

    Jan 1, 2003

  • NIOSH
    OFR-39-84 Postmining Results In Coshocton County, Ohio: Research On The Hydrology And Water Quality Of Watersheds Subjected To Surface Mining

    Surface mining and reclamation of a southeastern Ohio site with sandstone-shale overburden resulted in (as compared to premining levels): 1) runoff volumes and peak rates that increased by a factor of

    Jan 1, 1983

  • AUSIMM
    The Use of Comparative Sampling Methods at Cleveland Mine, Tasmania

    The use of comparative sampling methods during the evaluation of the tin-copper deposits at Cleveland mine yielded closely checking average results from groove, channel, AXT split diamond drill core,

    Jan 1, 1968

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005

  • SAIMM
    Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And Limitations

    By Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju

    High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe

    Jan 1, 2007

  • NIOSH
    RI 9432 - Rock Mechanics Investigations at the Lucky Friday Mine (In Three Parts)

    By M. E. Poad, J. K. Whyatt, T. J. Williams

    Researchers at the U.S. Bureau of Mimes monitored rock mass response to mining of an experimental underhand longwall stope in Hecla Mining Co.'s Lucky Friday Mine, Mullan, ID. This stope design,

    Jan 1, 1992

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • SAIMM
    Evaluation Of Elastic Deformation Energy In Stone Cutting Of Portuguese Marbles With A Diamond Saw ? Synopsis (1ffa6408-4007-4d02-91f4-3113bfc2ffa0)

    By P. Falcão Neves

    A detailed analysis of the geomechanical behaviour in rock cutting with a diamond saw is provided to obtain a better understanding of the mechanisms involved in the process. The energy of elastic defo

    Jan 1, 2012

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997