Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of Microseismic Monitoring to Longwall Geomechanics and Safety in Australia
By Xun Luo
In this paper we report on the use of microseismic monitoring techniques to investigate the fracturing process associated with longwall mining. The study was carried out at three mines in Australia an
Jan 1, 1998
-
Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine
By Kevin MacPherson
After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache
Jan 1, 1999
-
The Application of Pre-tensioned Grouted Tendons at Harworth Colliery, UK
By Chris Adams
The application of pre-tensioned tendon roof support assisted Harworth Colliery in their revival, from impending closure to lowest cost deep-mined producer in the UK, over just six months last year. T
Jan 1, 2003
-
An Analytical Approach For The Estimation Of Pillar Strength
A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
Numerical and Physical Modeling as Planning Tools for Rockbolted Roadways
By Peter Griesenbrock
In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo
Jan 1, 2002
-
An Assessment Of Rockbolting In Geologically Disturbed Mine Roadways
By Erdal Akyol
The rockbolting method of support is employed widely in several countries in different of mines. Hard rock mines use this method extensively. Soft rock mines, such as coal mines, have employed standin
Jan 1, 1992
-
Cross Well Acoustic Tomography To Locate Abandoned Underground Mines And Subsidence Failure
By Linda K. Killoran
The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomographic image reconstruction software for the detection and delineation of abandoned undergr
Jan 1, 1992
-
The Use of Pneumatic Stowing in Germany Considering Subsidence Aspects
By Axel Preusse
Stowing or waste fill is common in the German mining industry since the beginning of mining activities, With increasing mechanization, flat and gently inclined seams (0 -- 18) were mined. These mines
Jan 1, 2002
-
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine
By Steve P. Signer
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p
Jan 1, 2001
-
Crosshole Seismics: Applications In Mining
By Richard E. Thill
Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq
Jan 1, 1989
-
lnterpanel Barriers for Deep Western U.S. Longwall Mining
By Leo Gilbride
Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma
Jan 1, 2004
-
Horizontal Stress: The Root Of All Evil?
By J. Nielen van der Merwe
The effects of horizontal stress in coal mine roofs in South Africa did not receive the attention it deserved for several years, but now there is a danger that it may be over emphasized. A number of p
Jan 1, 2000
-
Measurement Of Structural Deformation And Tilt During Subsidence
By Revendra Awasthi
The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi
Jan 1, 1990
-
Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)
By Ed Mchugh
Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co
Jan 1, 1999
-
Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)
By Pier Paolo Manca
The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T
Jan 1, 1999
-
Determination Of Rock Strength Properties Using Geophysical And Ultrasonic Logging In Exploration Drill Holes
By John Feddock
This study deals with underground mines and ground control and the prediction of seats strength characteristics based upon ultrasonic logging. Exploration drill holes, both rotary and core holes are u
Jan 1, 2003
-
Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face
By S. Y. Liu
Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t
Jan 1, 1990
-
Landslide Occurrence and Causation in Steep Slope Areas of Appalachia
By David Newman
Landslides and soil creep often occur with varying degrees of severity on steep slopes within Southern Appalachia. Ground movement may take place over years with subtle changes in topography and veget
Jan 1, 1998
-
Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan
By Jay Keng
During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi
Jan 1, 1988
-
Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)
By Rao Pothini
Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under
Jan 1, 1992