Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Small Mine Contractor Safety - Case Studies
By F. Calizaya
The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind
Jan 1, 2008
-
Inland Steel Uses Technology, Cost Control, and Employee Involvement to Improve Its Productivity
By Samuel A. Reipas
Introduction The ore mining industry has been successful because of technological progress and huge sums of capital investment. But new technology and plants have not come cheap. The problem now is c
Jan 11, 1983
-
Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining
In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars
Jul 28, 2020
-
Thermodynamic Constraints On Arsenic And Heavy Metals Removal From Water With Limestone-Based Material
By A. D. Davis
Limestone-based material is effective for reducing arsenic concentrations below the current limit of 10 parts per billion for drinking water, typically resulting in final concentrations of about 4 to
Feb 27, 2013
-
Detail Survey of Polymetallic Nodule- Results of AUV Survey
By Akira Tsune, Shingo Sugimoto, Tadayuki Ishiyama, Nadao Saito, Masatsugu Okazaki
"The Deep Ocean Resources Development Co. Ltd. (DORD) of Japan signed a 15-years contract with the International Seabed Authority for exploration of polymetallic nodule in a 75,000 km2 area, consistin
Sep 1, 2014
-
Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)
By İbrahim Çınar, Hakan Özşen
Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su
-
Lake Cumberland Raw Water Intake Structure—Somerset Water Service
By Timothy M. Bruner, William J. Maloney
Faced with rapid growth that strained their current water supply capabilities, the Somerset Water Service in Somerset, KY decided to construct a new intake structure on the shore of Lake Cumberland. W
Jan 1, 2001
-
Heavy Medium Cleaning of – 28 Mesh Coal
By Edward Skolnik
The concept of using fluid dense media to separate heavy ore constituents from the lighter gangue dates back to 1858, when it was patented by Sir Henry Bessemer. Its use in coal did not begin until af
Jan 8, 1980
-
Assessment Of Stable And Failed Pillars In Underground Limestone Mines
Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na
Jan 1, 2008
-
APM Tunnels at Phoenix Sky Harbor International Airport
By David M. Jurich, Randy J. Essex, Alex de Aboitiz
An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t
Jan 1, 2005
-
Performance And Experiential Development Of The Mobile Miner At Mount Isa
By R. J. Boyd
SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc
Jan 1, 1987
-
Large Diameter Tunnel Boring Machine Development
By Martin Herrenknecht
The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula
Jan 1, 2010
-
Large Excavator Cuts Operating Costs at Alabama Coal Mine
By Bill Elverman
Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations
Jan 1, 2005
-
Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges
By James D. Nickerson
Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea
Jan 1, 2009
-
TBM Excavability: Prediction and Machine–Rock Interaction
By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold Mines
By W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
Massive Tires Keep The Industry Rolling
One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,
Jan 1, 2008
-
A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation
By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee
This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul
Sep 1, 2014
-
Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)
By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan
A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove
-
Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)
By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland
Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo
Jan 1, 2001