Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
IC 6578 Good rock-dusting and ventilation in two Alabama Coal MinesBy F. E. Cash
"Explosions in bituminous coal mines are preventable. The combination of adequate ventilation, thorough rock-dusting, and water on the cutter bars of mining machines and of empty and loaded cars will
Mar 1, 1932
-
Field Test With Strain-Gauged Friction Bolts At The Gold Hunter Mine, Mullan, Idaho, USABy Jeffrey Johnson, Carl Sunderman, Ted Williams, Stephen Signer, Douglas Bayer
To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in
-
IC 8835 Guide To Substation Grounding And Bonding For Mine Power SystemsBy Wils L. Cooley
Although electric utility companies have been active in grounding and bonding within substations, the mining engineer or mine electrical engineer is not involved to the extent that he can be fully up-
Jan 1, 1980
-
OFR-166-83 Assessment Of Alternative Power Sources For Mobile Mining Machinery ? SummaryBy James E. Cairelli
The NASA Lewis Research Center, under U.S. Bureau of Mines program direction, performed an assessment of alternative mobile power sources for mining applications. A wide variety of heat engines and en
Jan 1, 1981
-
OFR-52(1)-84 Surface Coal Mine Spoil Stability Study Eastern Coal Province - Volume IBy Paul G. Swanson
This investigation was conducted to identify the principle causes of spoil instability problems in the Eastern Coal Province. The study was also conducted to develop a matrix to predict the strength a
Jan 1, 1983
-
IC 8689 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.03 To 3.09 Million Tons From A 48-Inch Coalbed - Revision Of Information Circular 8641By Sidney Katell
This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 mill
Jan 1, 1975
-
IC 8311 A Thermal-Recovery Project And Two Waterflood Projects In Carter, Garvin, And Stephens Counties, Okla., 1966 (1fc5c005-c229-4b23-aa01-bbc50c92368e)By Kenneth H. Johnston
This publication describes a thermal-recovery project and two waterflood projects in Carter, Garvin, and Stephens Counties, Okla., that will be visited during the 1966 annual tour by the Bureau of Min
Jan 1, 1966
-
IC 8311 A Thermal-Recovery Project And Two Waterflood Projects In Carter, Garvin, And Stephens Counties, Okla., 1966By Kenneth H. Johnston
This publication describes a thermal-recovery project and two waterflood projects in Carter, Garvin, and Stephens Counties, Okla., that will be visited during the 1966 annual tour by the Bureau of Min
Jan 1, 1966
-
RI 5032 Anthracite Launder Screens: Factors In Their Design And Operation ? SummaryBy W. S. Sanner
This report describes the commercial application of the launder screen in anthracite-industry fine-coal cleaning operations. No new device, the launder screen has been used since the early part of the
Jan 1, 1954
-
IC 8527 Control Of Sulfur Oxide Emissions In Copper, Lead, And Zinc SmeltingAir pollution control regulation$ already implemented or being considered for implementation require substantial investment of capital to remove the sulfur oxides from copper, lead, and zinc smelter g
Jan 1, 1971
-
RI 5051 Factors Affecting The Incendivity Of Permissible Explosives ? IntroductionBy N. E. Hanna
[Testing explosives for safe use in coal miner ran boon an important factor in preventing mine explosions. In the United States, explosives that have been approved by the Bureau of Mines are called pe
Jan 1, 1954
-
OFR-85-79 A Full-Scale Investigation Of The Fuel-Load Hazard Of Timber Sets In MinesBy P. A. Croce
A total of 17 mine gallery fire tests (23 including sub-tests) were completed during this report period (10/1/76 - 11/30/77), directed at identifying a hazardous timber-set fuel-loading in a mine pass
Jan 1, 1978
-
IC 6910 Mining, Treatment, Methods, And Costs At The Gifford Hill & Co. Sand And Gravel Plant At Hoot Spur Near Texarkana, Tex. ? IntroductionBy J. W. Higgs
This paper, describing the operation of the Gifford Hill & Co. plant at Hoot Spur near Texarkana, is one of a series being prepared for and published by the United States Bureau of Mines on methods an
Jan 1, 1936
-
OFR-73-81 Evaluation Of Lixiviation Of Mine WastesBy K. L. Bainbridge
This report describes the results of a study to determine which types of, and to what extent, mining wastes can contaminate groundwater through leaching of acid-forming or potentially toxic constituen
Jan 1, 1980
-
OFR-171-82 Boulder Handling And Blasting For Greater Safety And Efficiency In CrushersBy Michael F. Dunn
Since crushing of rock to a smaller size is an integral part of almost any mining and quarrying operation, a study was carried out to identify and develop improved techniques for alleviating a major c
Jan 1, 1981
-
RI 7961 Tunnel Boring Technology - Disk Cutter Experiments in Metamorphic and Igneous RocksBy Roger J. Morrell
Bureau of Mines laboratory experiments with reduced scale cutter and cutter forces were performed to (1) define the fundamental relationships governing disk cutter performance and (2) to develop a met
Jan 1, 1974
-
OFR-12-83 Assessment Of Ground And Surface Water Effects Around Coal And Mineral Storage AreasBy Donald H. Koch
The project investigated the impacts of coal and mineral storage piles on both ground and surface water quality. The study consisted of two major tacks, Task 1 had two phases. The first phase was fiel
Jan 1, 1982
-
OFR-66-75 Excavation Of Coal Using A High Pressure Water Jet SystemBy David A. Summers
Coal is increasingly viewed as one of the major fuel resources of this country for the remainder of this century. The need to extract a greater percentage of the coal in a given seam, together with ad
Jan 1, 1974
-
OFR-41-81 Analytical Modeling Of Coal Mine Roof BehaviorBy R. T. Langland
Using a finite-element computer model, we have conducted an analytical study of roof behavior in a room-and-pillar coal mine. With standard engineering property in formation and a computer code develo
Jan 1, 1978
-
OFR-6(1)-77 The Impact Of Overmining And Undermining On The Eastern Underground Coal Reserve BaseBy Ronald W. Stingelin
This study undertook the development and implementation of a methodology for estimating the impact of coal seam interaction on the eastern bituminous underground reserve base as published in USBM Info
Jan 1, 1976