Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated Teams (021b2c60-f412-46df-9bbc-00d582f72391)

    By R W. Thomas

    This paper explores the possibilities of generating radical improvements in the drilling costs and productivity of blastholes through the efforts of integrated teams as opposed to traditional customer

    Jan 1, 1996

  • ISEE
    Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)

    By Sandy Tavelli, Thomas L. Barkley

    This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004

  • ISEE
    Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and Weather

    By Jeffrey Meissner, Mike Waldron, Charles Dowding

    Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the

    Jan 1, 2010

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • ISEE
    Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete Structures

    By Mark Svinkin

    To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I

    Jan 1, 2004

  • ISEE
    Using a low-density explosive and setting proper blast patterns to prevent Sympathetic Detonation at Itabira Mine in the Quadrilátero Ferrífero region.

    By Vitor Barcelos, Eduardo Elói, Gabriella Vaz, Davi Oliveira, Leandro Silveira

    Following a routine production blast at Vale S.A.'s Itabira Mine in the Quadrilátero Ferrífero region of Minas Gerais, Brazil, nearby residents registered complaints about blast-induced vibrations. An

    Jan 21, 2025

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • ISEE
    Journal: 16th Annual Photo and Art Contest / Best of Show Power Line Pass Kemano, British Columbia, Canada

    By Corry Goumans

    Description of Project: Drilling, Blasting and Installation of Catenary Cables. Project Owner: Rio Tinto Alcan

    Jan 1, 2010

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Reducing Coal Damage And Loss With A New Blasting Technology

    By Tapan Goswami, Lloyd Hain, Geoff Brent

    For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have pro

    Jan 1, 2008

  • ISEE
    Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.

    By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye

    The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial

    Jan 21, 2025

  • ISEE
    Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve Quarry

    By Douglas Bartley

    As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an

    Jan 1, 2012

  • ISEE
    The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance Intervals

    By Perry Sisk

    In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla

    Jan 1, 2013

  • ISEE
    Use of a Scaled Concrete Model to Determine the Origins of Air Overpressure

    By N. Skopak, W. Birch, A. Douglas, C. Johnson

    Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai

    Jan 1, 2024

  • ISEE
    Blasting Next to an Unsupported Road using Electronic Detonators

    By Tony Rorke, Sydney Thabethe

    A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the

    Jan 1, 2004

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    A New Method for the Prediction of Blast Vibrations and Suggestions with Respect to Uniform Reference Values for Short-Time Vibrations

    By Robert Boehnke, Bernd Mueller

    This contribution presents an innovative, statistically supported method to predict blast vibrations in rock mass. For modelling the processes during and after detonation, a theory is employed which i

    Jan 1, 2004

  • ISEE
    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Challenges Related to Near-Field Blasting between Critical Interstate and Railroad Infrastructure

    By Luiz Felipe Mendonça de Amorim, Adimir Fernando Rezende, Gustavo Sampaio Lopes, Claudio Cesar Gajardo Arraño, Eltton de Sousa Veras, Manuel Villalobos Calderon

    Many technical challenges were encountered while conducting near-field construction blasting between the critical intersection of Interstate 10 and multiple active railroad tracks in El Paso, Texas, f

    Jan 1, 2019

  • ISEE
    Blast Optimization through Long Term Fragmentation Analysis

    By Florian Bauer

    The Fording River mine in British Columbia produces hard coking coal in an open pit operation. Coal seams are exposed by blasting overburden and digging blasted muck with rope shovels. The drilling an

    Jan 1, 2014