    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Times Square Tower: Urban Squeeze

    By Tony D. Canale, Anthony Mazzo

    "Times Square, arguably one of the best-known destinations in the world, has undergone and continues to undergo a re-development aimed at attracting corporate tenants to the area. Mueser Rutledge Cons

    Jan 1, 2005

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Data Management Guide Specification

    By Laurel E. Blackman

    The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co

    Jan 1, 2021

  • DFI
    Experimental Studies on Behaviour of Single Pile under Combined Uplift and Lateral Loads (5ae0a39a-734f-4c2b-bd6b-06fe19e6d6ea)

    By K. Madhusudan Reddy

    "Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combin

    Jan 1, 2017

  • DFI
    Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test Verification

    By Tracy Brettmann, Melis Sutman, C. Guney Olgen

    "The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape

    Jan 1, 2017

  • DFI
    Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil Nails

    By Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko

    Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan

    Jan 1, 2017

  • DFI
    Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile Wall

    By Takefumi Takuma, Ali Fayad, Shigeru Kambe

    "This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W

    Jan 1, 2017

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place Project

    By Stuart Hardy, Xiangbo Qiu

    The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original

    May 1, 2022

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands

    By Nabil F. Ismael, Khalid Farraj

    "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa

    Jan 1, 2017

  • DFI
    Numerical Modeling Of Dynamic Soil-Structure Interaction In Bridges With Hp Driven Piles

    By Tu Bao

    HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many

  • DFI
    Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles (47ff630e-35bf-41f4-946a-236631b70ac5)

    By Andrew Rietz, Yu Bao, Steven Halewski

    "HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many y

    Jan 1, 2017

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    Rapid Load Testing In Germany

    By Marcel Bielefeld, Joost Bakker, Rob van Dorp

    Pile load testing can be performed by a static, rapid or high strain dynamic (generally designated as dynamic) testing method. The static load test is often considered the “gold standard” of testing w

    May 1, 2022

  • DFI
    Commentary on the Selection, Design and Specifcation of Ground Improvement for Mitigation of Earthquake-Induced Liquefaction

    By Ground Improvement Committee

    The evaluation of earthquake-induced liquefaction has become a routine part of geotechnical engineering design. For a given project, if an analysis identifies a potential for liquefaction and the cons