    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900

  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    After Sandy: Bay Park Sewage Treatment Plant Flood Protection

    By David Guy, John Stanbury, Gilbert Tallard

    "In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage

    Jan 1, 2016

  • DFI
    Army Corps Mega Projects Benefits From Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr

    Jan 1, 2017

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry Walls

    By Charles M. Wilk, Lori Tiefenthaler

    "Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is

    Jan 1, 2017

  • DFI
    Analysis of Three Axial Load Tests on Large Bored Grouted Deep Foundations

    By Hayel M. El-Naggar, Marawan M. Shahien

    "Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if

    Jan 1, 2017

  • DFI
    Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International Standards

    By Sowmiyaa. V. S., Tiruvengala Padma

    Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa

    Sep 1, 2022

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and Repairs

    By John P. Turner, Benjamin J. Turner

    "Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda

    Jan 1, 2016

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • DFI
    Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified Overburden

    By Michael J. Marasa

    "Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal

    Jan 1, 2017

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    Staged Construction of an Interstate I69 Embankment: Coupled Hydromechanical Numerical Simulation

    By Malek Smadi, Yazen A. Khasawneh

    "New embankments were constructed mostly on soft clays as part of interstate I69 extension in southern Indiana. The embankments serve as bridge abutments and as part of the fill sections along the int

    Jan 1, 2017

  • DFI
    Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure

    By D. Barber, A. D. Miller, P. A. Bray

    The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx

    Jan 1, 2017

  • DFI
    Jet Grouting for Strength in Marine Sediments with Hydrocarbons

    By Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston

    Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest

    Jan 1, 2019

  • DFI
    Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives

    By Michael Gebman, Jack Gerwick

    "With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch

    Jan 1, 2016

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • DFI
    Deep Foundation Support for the Iconic New York Wheel

    By Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran

    "This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor

    Jan 1, 2016