Organization
  • DFI
    Ground Movements - A Hidden Source Of Loading On Deep Foundations (211df4c9-c07d-4182-8335-8f47bcc59b12)

    By Harry G. Poulos

    Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism

    Jan 1, 2007

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • DFI
    Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary

    By Edmund J. Cardoza

    The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is

    Jan 1, 1992

  • DFI
    Foundations On Karstic Limestone In Kuala Lumpur Malysia ? Synopsis

    By J. M. Mitchell

    Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h

    Jan 1, 2010

  • DFI
    Auger Pressure Grouted Displacement Piles: An Acceptable Alternative

    By Osama El-Fiky

    There are many types of deep foundations currently being used in the San Francisco Bay Area, one of the most common being driven precast, prestressed concrete (PC/PS) piles. PC/PS piles are frequently

    Jan 1, 2002

  • DFI
    An Unusual Permanent Shoring Job

    By Gordon Demetrick

    3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi

    Jan 1, 1987

  • DFI
    History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary

    By James S. Graham

    Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area

    Jan 1, 2000

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background

    By Colin C. West

    On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p

    Jan 1, 1987

  • DFI
    Deep Bored Piling in Soft Soil and High Lateral Loads

    By W. Sondermann

    "AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on

    Jan 1, 2014

  • DFI
    Real-Scale Tests on Soil Mix Elements

    By Nicolas Denies, Gust Van Lysebetten, Bart Lameire, Jan Maertens, André Vervoort, Noël Huybrechts, Flor De Cock

    "Abstract Originally developed for ground improvement works, the deep mixing method (DMM) has increasingly been applied in recent years for the realization of soil and water retaining structures and a

    Jan 1, 2014

  • DFI
    Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And Overview

    By Edmund J. Cardoza

    WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM

    Jan 1, 2001

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992