Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Plastics From Shredder Residue: Pilot Plant Experiences And DataBy S. Christiansen, G. R. Winslow, R. W. Kobler
Todays End of Life vehicles are shredded and their metal components recovered and recycled by standard methods. The remaining non-metallic fraction is shredder residue, and contains vast amounts of hi
Jan 1, 2001
-
Concreting the Queens Tunnel, New York City Water Tunnel No.3By Edward M. Dowey
The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring
Jan 1, 2001
-
Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in SingaporeBy K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai
The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa
Jan 1, 2001
-
Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced ShotcreteRecently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate
Jan 1, 2001
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua
Jan 1, 2001
-
Commissioning Under a Microscope ù The Cawse Nickel Start-UpBy R Young, D OÆSullivan
When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj
Jan 1, 2001
-
Ore Treatment at Martha Current Operations and Future DirectionsThe treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t
Jan 1, 2001
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift MethodBy Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Production of Paste from Total Tails in a Deep Cone Thickener A Case StudyBy Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary
"In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo
Jan 1, 2001
-
The Influence Of Geology On A Simulated RockburstBy N. Reddy
The influence of local geology and rock mass characteristics on deformations during a rockburst caused by a controlled blast was studied. This was done by means of visual examination, mapping and phot
Jan 1, 2001
-
Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”By J. R. Piper
“Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e
Jan 1, 2001
-
A Method to Design Optimum Pastefill Mixes Through Flow Cone and Mini Slump cone TestingBy Kugan Kuganathan
Pastefill is being increasingly considered as a viable fill by underground mine operators. Mount Isa Mines (MIM) chose pastefill to fill their deep copper mine (>1200m deep) after considering various
Jan 1, 2001
-
American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in RockBy S. Schina
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme
Jan 1, 2001
-
Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest QueenslandBy Patrick J. Williams, Peter J. Pollard
"Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a
Jan 1, 2001
-
Numerical Simulation on Microseismicity Due to Mining at One of the Collieries in AustraliaNumerical simulation for microseismicity due to mining at one of the collieries in Australia was carried out and the results were compared to the observed microscismicity. 3-D Stress analysis showe
Jan 1, 2001
-
Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\By Massimo Concilia, Remo Grandori, Paolo Nardone
Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excav
Jan 1, 2001
-
On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’By Phillip Cancilla, Daniel Roy, Frank Rosenblum
"The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti
Jan 1, 2001
-
Geology Of The Storm Gold Deposit, Northern Carlin Trend, NevadaBy R. Hipsley, D. Arbonies, P. J. Dobak, M. Visher
The Storm deposit is a high grade breccia hosted “Carlin-type” gold deposit located at the north end of the Carlin Trend. Storm consists of 3 smaller deposits: 1) 49er Zone, 2) End Zone, 3) Discovery
Jan 1, 2001
-
Improve Milling Through Better Powder DistributionBy Jack Eloranta
Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces
Jan 1, 2001
-
Regulatory Review of Blasting Related Citizen ComplaintsBy Kenneth Eltschlager
The Surface Mining Control and Reclamation Act of 1977 requires that blasting be conducted so as to prevent injury to people and damage to public or private property. The three adverse effects are fly
Jan 1, 2001