    Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure At Surface Coal Operation With A Retrofitted Filtration And Pressurization System (83490ae4-de2e-4245-8093-9fec0a123d31)

    By W. A. Heitbrink, J. D. Ashley, R. E. Gresh, J. A. Organiscak, A. B. Cecala

    Many different types of mobile equipment used in surface coal mining utilize enclosed cabs to protect equipment operators. The overburden removal process is extremely dusty and can cause excessive ex

    Jan 1, 2002

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • SME
    The Successful Implementation Of An Expert System On An Alumina Calcining Kiln

    By D. Lawrence, H. Lawrence, G. Saevil

    Plant operators in the mineral processing industry have been implementing expert systems for several years now, with the intent to increase production and reduce costs. Most systems have been installe

    Jan 1, 2002

  • SME
    Improved Process Control Through Real-Time Measurement Of Mineral Content

    By D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca

    In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure

    Jan 1, 2002

  • SME
    A Robust Water-Balance Method For Sizing Heap Leach Solution Ponds

    By J. R. Kunkel, V. Lishnevsky

    At mine sites, the operational and required storage volumes of solution and water storage ponds and reservoirs are usually calculated based upon a water-balance approach. Many climatological variables

    Jan 1, 2002

  • AUSIMM
    Aluminium Recovery from Water Treatment Plant: A Contribution to the Self-Sustainability of the Water Treatment Process

    By F H. S dosSantos, R L. C Santos

    The main objective of this work was to develop, at a laboratory scale, a process for treating residues from the settling stage of water treatment so as to remove and recover the aluminium as sulphate.

    Jan 1, 2002

  • SME
    Evolution Of Sag Mill Shell Liner Design At Kennecott Utah Copper’s Copperton Concentrator

    By D. W. Partridge, W. Lamb, A. E. Lamb, S. Bird

    Due to the constant need to improve SAG mill performance and efficiency, extensive research into all aspects of SAG mill optimization has been performed. This paper will review the current evolution

    Jan 1, 2002

  • SME
    Neutralization of acid mine pit water at Gibbons Creek lignite mine

    By J. K. Horbaczewski

    The reclamation of an open dragline pit (Pond A3P-2) at the Gibbons Creek lignite mine in east-central Texas required neutralization of acid mine pit water. At the start of treatment with hydrated lim

    Jan 1, 2002

  • CIM
    Study of slime coatings in flotation by electrophoretic mobility distribution measurement

    By Jacob Masliyah, Zhiang Zhou, Tshitende Kasongo, Jianjun Liu, Zhenghe Xu, Jeawon Choung

    "Slime coating is a recognized challenge in fine particle flotation, not only in decreasing recovery, but also in reducing the selectivity and hence froth quality. In this presentation, a novel method

    Jan 1, 2002

  • SME
    Exploring Jurassic Porphyry Coppers In The Amazon Jungle Of Ecuador

    By J. D. Lowell, L. Quevedo

    I will talk today about a porphyry copper exploration program now underway in the Amazon jungle in the southeastern part of Ecuador near the border with Peru. The project is unusual for two reasons:

    Jan 1, 2002

  • CIM
    A Focus on Variability within the Orebody for Improved Design of Flotation Plants

    By Glenn Kosick, Roger Amelunxen, Glenn Dobby

    "The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso

    Jan 1, 2002

  • SME
    Thickening And Disposal Of Oil Sand Tailings

    By H. Hamza

    Oil sand tailings are disposed of in large ponds in which MFT (Mature Fine Tailings, a stable suspension of fine particles in water) forms after many years of settling. Long-term storage of large volu

    Jan 1, 2002

  • SME
    U. S. Coal Producers Have Reason to Take Heart

    By Steve Kral

    For an industry that provides more than half of the nation’s energy needs, the U.S. coal industry still attracts negative publicity. However, the nation’s energy appetite continues to increase. And

    Jan 1, 2002

  • CIM
    Dynamics of Canadian coal supply

    By D. O. Downing

    "The 1990s saw enormous changes in the Canadian coal industry and the future promises to be no less turbulent. While the markets served by Canadian coal producers have changed and buying practices con

    Jan 1, 2002

  • AUSIMM
    Geostatistically Assisted Domaining of Structurally Complex Mineralisation: Method and Case Studies

    By M Humphreys

    Multi-episodic mineralisation is often characterised by different spatial trends exhibited by different generations of the mineralisation. The structural complexity of mineralisation together with the

    Jan 1, 2002

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • SME
    Driving Point Impedance—A New Paradigm For Detecting Fracture And In Situ Stress In Boreholes

    By D. M. Weinberg, S. R. Novascone, R. R. Reynolds, J. H. Cole, C. D. Christensen

    The mechanical properties of the rocks surrounding an orbital vibrator alter the shape and amplitude of the vibrator’s orbit. Detecting these changes with driving point impedance measurements promises

    Jan 1, 2002

  • CIM
    Variation of thermal conductivity of rocks with pressure

    By A. Demirci, A. Keçeciler, Y. S. Durutürk

    "This paper deals with the results of the variation of thermal conductivity of rocks with pressure on a laboratory scale. For this purpose, the authors have added a pressure-supplying unit to the appa

    Jan 1, 2002

  • CIM
    Obtaining metallurgical data from drill core samples using a mini pilot plant

    By Nilce Alves Santos, Vânia Lúcia de Lima Andrade, Keila Lane Carvalho Gonçalves, Harold Wyslouzi1

    "When confronted with the difficult decisions on advancing an exploration project to the feasibility and construction stages, it is important to know how various regions of the ore body will react in

    Jan 1, 2002