Search Documents

Sort by

  • CIM
    Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems

    By Leslie F. Sawatsky

    Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie

    May 1, 2004

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Preparing a Long-Lasting Environmental Impact Statement

    By Glen A. White

    The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi

    May 1, 2004

  • CIM
    Water Supply Sourcing Options for Oil Sands Mines

    By Leslie F. Sawatsky

    Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin

    May 1, 2004

  • CIM
    Shortcomings of Environmental Assurance in Mining and the use of Insurance as a Complement

    By Richard Poulin

    Rehabilitation of mined out areas is often enforced by environmental bonding. It is usually assumed that this process provides financial assurance that rehabilitation will be carried out as agreed at

    May 1, 2004

  • CIM
    Odor Sensors for Ore Sorting and Mill Feed Control

    By Michael G. Nelson

    Control of the feed provided to mineral processing facilities is a continuing challenge. Much effort is currently being devoted to overcoming these problems. These projects are usually described under

    May 1, 2004

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Update of Span Design Curve for Weak Rock Masses

    By Andrea M. Ouchi

    A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR

    May 1, 2004

  • CIM
    Alberta Energy and Utilities Board (EUB) Field Surveillance Branch Building Relationships with Aboriginal Communities

    By Rob Barber

    This paper shares the experience of the Alberta Energy and Utilities Board (EUB) Field Surveillance Branch over the past few years in building relationships with Aboriginal communities. Our goal is to

    May 1, 2004

  • CIM
    Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case Study

    By Peter A. Eshun

    This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff

    May 1, 2004

  • CIM
    Climate and Hydrology Data Collection for Northern Mine Development

    By Nathan P. Schmidt

    Climate and hydrology data are required during all phases of mining projects, including impact assessment, mine planning and design, operational water management and mine closure and reclamation desig

    May 1, 2004

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    ERP Systems in the Brazilian Mining Industry: A Case Study

    By Paulo F. T. Sachs

    ERP systems have been widely implemented nowadays in several industries. However, ERP was originally designed to fit former MRP and MRP II users, and most of the ERP research has been focused on discr

    May 1, 2004

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    Grindability Assessment Using Particle Size or Particle Surface Area

    By Baoquan An

    The energy required to fragment a rock is proportional to the increase in the fracture surface area and hence is proportional to the rock?s surface area. In comminution, the slope of the linear relati

    May 1, 2004

  • CIM
    High Chromium White Irons for Slurry Pump Service in Mineral Processing

    By Rees J. Llewellyn

    High chromium white irons can be formulated to provide required combinations of abrasion and erosion wear resistance, toughness and capability to withstand corrosion attack. As a consequence, they are

    May 1, 2004

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004