Search Documents

Sort by

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • TMS
    Preparation Of Monodispersed NiO Precursor Particles By Induced Precipitation Of Solid Oxalate Acid

    By Huang Kai

    By adding the solid oxalate acid powder into the solution of nickel chloride or its ammonia coordinated solution, the uniform compound particles were prepared and the precipitated particles were trans

    Jan 1, 2005

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • SAIMM
    Rockpasses: A Guide To Excavation Methodology

    By U. Sachse

    This paper explores a systematic approach for mining decision-makers to use when faced with choosing which method to use for a specific rockpass length. The different excavation methods available in t

    Jan 1, 2005

  • SAIMM
    Mining Grade And Sampling Theory - The Logical Way To Evaluate Ore Reserves

    By P. I. Page

    In mineral exploration the place that yields the first significant result is marked and two questions are posed immediately. Where should the next sample be drawn and how big should it be? At present

    Jan 1, 2005

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • TMS
    Productivity Increase In A Peirce-Smith Converter Using The Cop Kin And OPC System

    By Thomas Prietl

    The use of gas stirring systems through the furnace bottom is common for anode and holding furnaces in the copper industry The first implementation of a gas stirring COP KIN® system in a Peirce-Smith

    Jan 1, 2005

  • SME
    Ore Characterization For Process Control: An Update Of A Mesabi Range Project

    By Richard Gertsch, Jack Eloranta, Leslie Gertsch

    An ongoing research program is characterizing the ore qualities that most affect mine and mill processing of iron. Current practice uses assays of magnetic iron and silica, but additional qualities a

    Jan 1, 2005

  • RMCMI
  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • CIM
    Decommissioning For Sustainability with Ecological Engineering

    By Margarete Kalin

    "Difficulties arise in implementing environmental technologies in the mining sector because important fundamental processes, which lead to the environmental degradation, are ignored. Weathering rates,

    Jan 1, 2005

  • ISEE
    Developments of Granular Emulsion Explosives

    By Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki

    Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A

    Jan 1, 2005

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • SAIMM
    The Relationship Between The Client, Clients Project Team And The EPCM Project Team

    By C. A. F. Sweet

    The inter-relationship between these parties and the effect on the outcome of the project is often grossly underestimated. There are numerous success stories where the parties have worked as com

    Jan 1, 2005

  • ISEE
    Future Directions in Ground Vibration and Airblast Control within an Australian Regulatory Context

    By A Brodbeck, AT Spathis

    Australian regulatory control of ground vibration and airblast arising from mining, quarrying and civil construction operations is spread across a number of federal, state and local authorities and ac

    Jan 1, 2005

  • SME
    Emerald Mining in Afghanistan

    By Antoni Kalukiewicz

    From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza

    Jan 1, 2005

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005