Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal MinesBy A. Wahab Khair
Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-
Jan 1, 2008
-
Energy Fuels Prepared To Ride Uranium?s ResurgenceThe two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en
Jan 1, 2008
-
Liberation of a Large Quantitiy of Waste Materials by the Explosion in Water: A Technique with a Relatively Low Energy ConsumptionBy Gjergj Dodbiba, Atsushi Shibayama, Toyohisa Fujita, Takashi Shikazumi, Yukio Kato, Kenji Murata
"A new crushing or liberation technique by means of underwater explosion is put forward. This technique is suitable for crushing and liberating various materials, for instance: the electric parts of t
Jan 1, 2008
-
Risk Management of the Canada Line Transit Tunnels ? IntroductionBy Brendan Henry
The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a
Jan 1, 2008
-
Field Evaluation of the Coal Dust Explosibility Meter (CDEM) (f4528243-a49d-4f61-b519-915a18b2dfc3)By M. L. Harris
In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) has d
Jan 1, 2008
-
"Journal: 100 Years / Keystone Placer Testing and Mineral Prospecting Drillers Catalog No. 2Keystone Driller Company Beaver falls, Pennsylvania 1907"By Oliver Finn
Gold dredging has made such rapid strides of late and there is such a widespread interest in this branch of mining that I venture to contribute a detailed account of the way in which a Keystone drille
Jan 1, 2008
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
An effective face support system to minimize rockfalls - SynopsisBy N. D. L. Burger
An effective prototype face support system to minimize rockfalls in rockfall-prone mines was developed and patented during a project sponsored by the Mine Health and Safety Council (MHSC). An experime
Jan 1, 2008
-
The Use of Polymer Concrete in Sewage Tunnels for One-Pass Segmental LiningsBy Christian Maguire
The presence of hydrogen sulphide in sewerage systems leads to severe concrete corrosion. Acid causes breakdown of the concrete matrix, and attacks reinforcement. Older sewer systems under acid attack
Jan 1, 2008
-
Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific DataBy Vincent Scovazzo
This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr
Jan 1, 2008
-
Investigating continuous time open pit dynamics - SynopsisCurrent mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos
Jan 1, 2008
-
In-Mine Evaluation Of Smart Mine Fire Sensor (e0413569-6dc4-41a0-bd26-5c60fdfe0934)By R. A. Franks
An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system?s ability
Jan 1, 2008
-
Novel High Efficiency Gold Extraction Process Using NanotechnologyBy Adil Aledresse, Louis Mercier, Laxman Amaratunga
"The development of high capacity adsorbents with uniform porosity denoted, MP-HMS (Mercaptopropyl – Hexagonal Mesoporous Structure) using nanotechnology, and their ability to extract gold from soluti
Jan 1, 2008
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real ProjectTruck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor
Jan 1, 2008
-
State Summaries ? ArizonaBy N. Niemuth
Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea
Jan 1, 2008
-
Battery Park Truck Sewer Emergency Tunnel ProjectBy Mark Rybak
On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse
Jan 1, 2008
-
Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH CavernBy Heiner J. Sander
Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe
Jan 1, 2008
-
Head Grade Effects on Gold RecoveryThe occlusion of unliberated gold particles in silicates and sulfides in crushed/milled ore dictates the recovery that can be expected. The grade of this occluded gold in cyanide leach residues shows
Jan 1, 2008
-
Production OperationsBy Lee W. Saperstien
At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b
Jan 1, 2008