Search Documents

  • CIM
    High Pressure Washing Technology “Hydro-Clean”

    By Sam Palombo, James José Varela

    "Washing can be defined as the process used to eliminate or reduce the dirt (presence of fines or slimes) of one material. It is also the basic and oldest process applied to ore preparation for furthe

    Jan 1, 2009

  • NIOSH
    OFR-37-78 Development Of A Nonprimary-Explosive, Low-Voltage Electric Detonator For Use In Mining Operations

    By P. B. Ritter

    The feasibility of redesigning and adapting the all- secondary-explosive, low-voltage, electric safe detonator for use as a delay detonator has been demonstrated. Experimental results have shown that

    Jan 1, 1977

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010

  • NIOSH
    RI 9451 - Effect of Pressure on Leakage of Automatic Sprinklers

    By Charles P. Lazzara, Alex C. Smith, Richard W. Pro, Mark W. Ryan

    The U.S. Bureau of Mines conducted a study to determine if commercially available automatic sprinklers could withstand the high static pressures in deep underground coal mines without leaking and if e

    Jan 1, 1993

  • SME
    Quarry Expansion – Sustainable Management of Natural Aggregate

    By M. L. Tucker, William H. Langer

    Many countries, provinces, territories and states in the European Union, Australia, Canada, the United States and elsewhere have begun implementing sustainability programs. Most of those programs, ho

    Jan 1, 2004

  • ISEE
    Cap Precision in Perimiter Control Blasting and the Potential Application of Electronic Detonator

    By Derek T. Novotny

    Blasting cap precision is of major importance to advanced blast design. New technologies have introduced the use of microchips within detonator casings in the hope that the electronic control of the t

    Jan 1, 1998

  • NIOSH
    RI 5754 Removing Quartz And Other Impurities From Refractory Clays By Mineral Dressing Methods ? Introduction And Summary

    By W. A. Calhoun

    The purpose of this investigation was to develop economical mineral dressing processes for removing objectionable quantities of impurities, such as quartz and pyrite, from refractory clay deposits in

    Jan 1, 1961

  • RMCMI
    The Seven Habits of Highly Effective Maintenance Organizations

    By Paul Swatkowski

    A Note About Copyrighted Material ??Permission to Use? has been granted ?Teachthe7habits ?Think win/win (4thHabit) ?Don?t stop here ?i.e., buy the book

    Jan 1, 2009

  • SAIMM
    Failure probability analysis of high rock slopes based on bionic algorithm

    Abstract : The computation of reliability index or failure probability of slopes can be transformed into an optimisation problem. In high rock slope engineering, it is usually a multimodal optimizatio

    Jan 1, 2003

  • SME
    Application Of The Split-Online Sag Feed Size Analyzer At P.T. Freeport Indonesia

    By A. Supomo, A. Partanen, M. Mular

    Although many SAG operators may agree that on-line measurement of SAG feed-size is an attractive notion, applying this information in a control strategy that recovers the investment, engineering time,

    Jan 1, 2001

  • NIOSH
    Better Stoppings For Mines With Large Entries - Objective

    Provide improved permanent stoppings designed specifically for use in mines with large cross-sectional entries. Approach The large entry sizes in many mines, such as oil shale, salt, and limesto

    Jan 1, 1987

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • IOM3
    Analysis by chemical potential diagram of the oxidation of molten silver selenide

    By G. G. Barbante

    An understanding of the thermodynamics of smelting copper anode slimes is a prerequisite for improvements to the process. During slimes smelting, a silver-copper selenide matte is formed and subsequen

    Jun 21, 1905

  • AIME
    Technical Notes - Production of Titanium from TiCl4, in an Arc Furnace

    By L. D. Jaffe, R. K. Pitler

    IT would clearly be advantageous to produce molten titanium, suitable for alloying and casting, directly from the relatively inexpensive tetra-chloride, without using a metallic reducing agent. Accord

    Jan 1, 1951

  • SME
    Water Tunnel Beneath New York Harbor

    By Mohammad R. Jafari

    The Camp Dresser & McKee (CDM)/Hatch Mott MacDonald (HMM) joint venture has been engaged by the New York City Economic Development Corporation (NYCEDC) to provide engineering ser-vices in connection w

    Jan 1, 2008

  • AUSIMM
    World-Class IOCG Deposits and Potential Deposits in South Australia

    By P S. Heithersay, M McGeough

    The discovery of Olympic Dam in 1975 and, more recently, Prominent Hill in 2001 and Carrapateena in 2005 demonstrates the potential for world-class IOCG deposits in South Australia. Potential for furt

    Jan 1, 2007

  • CIM
    A History of Improvements at the Kemess Concentrator

    By Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman

    "Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments

    Jan 1, 2005

  • AUSIMM
    The Petrography of Some New South Wales Permian Coals from the Tomago Coal Measures

    Permian coal seams from the Tomago Coal Measures in the Northern Coalfield, New South Wales, were analysed petrographically and reflectance measurements made for each. Vitrite contents were moderate t

    Jan 1, 1968

  • CIM
    Experimental investigation of the oxidation and consolidation of sulphide aggregates and the application to underground muck-piles Lockerby Mine, Sudbury, Ontario

    By S. Nikolic, O. O. Kehinde-Philllps, O. T. Djamgouz, D. H. Rousell

    "A bulk mining method is employed at the Lockerby mine resulting in the formation of large muck-piles. If these muckpiles remain in the stopes for some time they may agglomerate to the extent that the

    Jan 1, 1984

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008