Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries

    By John R. Poland, Benjamin Mirabile

    "There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.

    Jan 1, 2016

  • SME-ICGCM
    Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?

    By Russell Frith

    Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities

    Jan 1, 2005

  • SME-ICGCM
    Impacts of Longwall Mining on Hydrology, Soil Moisture, and Tree Health in Belmont County, Ohio

    By David Bartsch

    The Ohio Valley Coal Company (Ohio Valley) has operated the Powhatan No. 6 Mine in Belmont County, Ohio since 1972. Ohio University owns a 455-acre research farm over a portion of the Ohio Valley rese

    Jan 1, 2005

  • SME-ICGCM
    Potential Application of Short Encapsulation Pull Test (Sept) Data to Project Relative Roof Control Risk

    By Yoginder Paul Chugh, Jason E. Tinsley

    "Over the last five years, the authors have compiled a database of Short Encapsulation Pull Test (SEPT) evaluations from Interior Basin (Basin) coal mines. Typically, SEPT data are analyzed to obtain

    Jan 1, 2016

  • SME-ICGCM
    Estimating Coal Strength Based on Historical Laboratory Tests and Geomechanics Classification

    By Andre Zingano

    The coal seam strength and the failure criteria that represent the behavior of the coal seam are very important for mine section and pillar design. Additionally, mine section and pillar design take in

    Jan 1, 2014

  • SME-ICGCM
    Merging Coal Mine Geologic Hazard Mapping with Mine Production Rates—Industry Experience

    By Kevin Andrews, Scott Nelson, Terry Hamrick

    "In the process of Geologic Hazard Mapping (GHM) for underground coal mining, geologists evaluate the effects of various geologic and geotechnical conditions to assist with optimization of mine produc

    Jan 1, 2018

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep Cover

    By Daniel W. H. Su

    Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.

    Jan 1, 2014

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    Challenges of Room and Pillar Mining at 900 M Depths in the Czech Republic

    By William J. Schloemer

    INTRODUCTION The history of coal mining the Ostrava Region of the Czech Republic goes back nearly 250 years. Both coking coal for steelmaking and thermal coal for the production of energy are mined h

    Jan 1, 2014

  • SME-ICGCM
    Upwards Surface Movement above Deep Coal Mines after Closure and Flooding of Underground Workings

    By Pierre-Yves Declercq, Andre Vervoort

    "After the mass closures of entire coal mine districts in Europe at the end of the last century, a new phenomenon of surface movement was observed—an upward movement. Although most surface movement (i

    Jan 1, 2017

  • SME-ICGCM
    Evaluation of Drill Hole Geometry on Bolted Roof Beam Performance

    By David R. Burkhard

    "Comparative roof beam performance, as measured by delamination within the bolted horizon, was used to evaluate two types of roof bolt drill hole geometries in a development setting. Short encapsulati

    Jan 1, 2016

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017

  • SME-ICGCM
    Think Like a Rock

    By Tom Barczak

    Early in my career, while giving a presentation on shield design for longwall mining at one of the International Conferences on Ground Control in Mining, the late Jim Scott told me that I was finally

    Jan 1, 2011

  • SME-ICGCM
    Development of a Six Drilhead Roof Bolting Machine

    By Bill A. Kyslinger

    "In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design

    Jan 1, 2016

  • SME-ICGCM
    Estimating Rock Mechanics Parameters through Shear Wave Analysis with Well Cad

    By William R. Kohl, Craig B. Clemmens

    "Since 2010, North Central Resources, Bridgeport, WV, has been using the sonic log to estimate the rockmechanics properties of the coal and adjacent strata in their exploration drilling program. In 68

    Jan 1, 2015

  • SME-ICGCM
    Investigation of the Influence of Mining with Caving on Deformation of Roadway Located in Close Proximity of Longwall Panel

    By Andrzej Walentek

    In polish coal mining due to specificity of seams lying the multiple extraction is used. In this kind of mining, it is essential to take into account all geological and mining conditions which have an

    Jan 1, 2013

  • SME-ICGCM
    Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump Susceptibility

    By Arthur Miller, Andrew Weakley, Heather E. Lawson

    "IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the

    Jan 1, 2015