Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Eclipse System Bolting In The Illinois Basin
By Alan Campoli
Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe
Jan 1, 2004
-
Analysis of Seismic Source Parameters of Roof Falls in Time and Space for Assessing Strata Stability by Microseismic Technique at Rajendra Longwall Coal Mine in India: A Case Study
By C. Srinivasan
Microseismic emissions are generated by deformation and cracking of rock around an opening inside a mine. The rock tends to achieve equilibrium in a new geometry under changing stress conditions was f
Jan 1, 2005
-
Influence of Mine Layout, Mining Method, and Geology on Down?Dip Coal Barrier Performance at the Solar No. 7 Mine
By Anthony T. Iannacchione
The Solar No. 7 and Solar No. 10 mines were designed to prevent mine waters from directly discharging to the surface. In January of 2004, a discharge occurred as the Solar No. 7 mine was in its final
Jan 1, 2013
-
Analysis Of Practical Ground Control Issues In Highwall Mining
By R. Karl Zipf
Highwall mining is an important coal mining method. Upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production. A review of the M
Jan 1, 2004
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining
By Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015
-
Development and Evaluation of Corrosion Resistant Coating for Expandable Rock Bolt against Highly-Corrosive Ground Conditions
By Kevin J. Ma, John Stankus, Dakota Faulkner
"Expandable rock bolts are widely used in hard rock mines as an efficient ground control product. However, capacity and service life can be significantly reduced if the metallic body is subjected to c
Jan 1, 2017
-
Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building
By Gennaro G. Marino
As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w
Jan 1, 2013
-
Investigation of Fully Grouted Roof Bolts Installed Under In Situ Conditions (8fabb507-7dbd-4e7d-b9c9-518c3be86281)
By Craig Compton
The The National Institute for Occupational Safety ane Health (NIOSH) Pittsburgh Research Laboratory (PRL) is continuing to investigate the behavior of fully grouted roof bolts in the weak roof rock o
Jan 1, 2005
-
Development of Road Header Roof Bolting Module
By Sean C. Farrell
In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P
Jan 1, 2014
-
Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover
By Ashok Kumar, Rajendra Singh, Petr Waclawik
High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill
Jan 1, 2018
-
Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams
By Pengfei Wang, Guorui Feng
With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large
Jan 1, 2018
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata
By J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines
By Matthew J. DeMarco
Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t
Jan 1, 1993
-
Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal Seams
By Zhaohui Wang, Jiachen Wang
"Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h
Jan 1, 2018
-
Study on Eco-Friendly Underground Mining System for Ultra-Thick Coal Seams in Thailand
By Takashi Sasaoka
EGAT Mae Moh Lignite Mine in Thailand produces about 16 million tons of lignite annually from open-cut mining. The coal is used to generate 2,400 MW of electricity. In the near future, however, the co
Jan 1, 2011
-
Microseismic Monitoring In The Sydney Coalfield
By G. R. Corbett
Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst
Jan 1, 1994
-
A Case History of Computer-Aided Lineament Analysis for Ground Control Planning
By C. D. Peters
The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu
Jan 1, 1986
-
Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories
By Michael Gauna, Christopher Mark
"Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted
Jan 1, 2016
-
Strata Disturbance Prediction For Mining Beneath Surface Water And Waste Impoundments
By Madan M. Singh
Mining under bodies of water such as oceans, lakes, rivers, streams, ponds, and other impoundments, is not a new technique. However, in the United States it has been fairly restricted to date. In orde
Jan 1, 1981
-
A Cooperative Study Of Gate Entry Designs Welbeck Colliery (UK) And Jim Walter Resources (USA)
By Greg Hendon
Longwall developments in the UK have historically consisted of single entry gate roads. Adjacent developments were separated from existing panels by large barrier pillars (designed of sufficient width
Jan 1, 1995