Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Grade control in mineral sands – The unique conditions at Old Hickory, Virginia
By A. J. Romeo
The Old Hickory heavy mineral ore body, which lies within the Fall Zone of south central Virginia, has been mined since 1997. There are many differences in this deposit when compared to humate-laden m
Jan 1, 2005
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part IV: Application At Morenci, Arizona
By J. O. Marsden
Parts I and II in this series of papers presented the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical development of a process to effect
Jan 1, 2007
-
Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)
By Christopher J. Bise
INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by
Jan 1, 1986
-
Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162
By C. Treworgy, C. Chenoworth
Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois
Feb 24, 1997
-
Metallurgical Development And Design For The Pascua Lama Project
By R. A. Williams
The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is
Jan 1, 2001
-
Wetting The Coal Face For Dust Control In Longwall Mining At High Ventilation Air Speeds
By J. -G. Swanson
Dust control in longwall coal mining depends primarily on the prevention of dust at the source and secondarily on the suppression of airborne dust. One of the primary methods for the prevention of du
Jan 1, 2012
-
Rehabilitation of the Cape Creek Highway Tunnel Under Traffic
By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf
Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha
Jan 1, 2005
-
Revamp And Modernization Of Gearless Mill Drives
By M. Ahrens
Gearless mill drives (GMD) are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive s
Jan 1, 2008
-
Pogo Mine Control System: A Hybrid of DCS and PLC
The Pogo Mine, near Delta Junction, Alaska is a new 2500 STPD gold operation. The control system of the mine and milling operations are a hybrid of DCS (Distributed Control System) control and PLC (Pr
Jan 1, 2008
-
Pumping and Drainage
By Christopher J. Bise
INTRODUCTION The control of nuisance water in a mine is extremely important; left uncontrolled, nuisance water can have a severe effect on haulage, ventilation, production, and the health and safe
Jan 1, 1986
-
Capillary Cover Design For Leach Pad Closure
By K. Burke, G. Zhan, A. Mayer
A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil
Jan 1, 2001
-
International education of mining engineers ? an update on the Australian experience and international opportunities for collaboration
Collaboration between education providers is the key to long-term sustainability and improved quality in mining education. The mining industry is now, more than ever, an industry doing business on a g
Jan 2, 2010
-
Mine Fire Detection Under Zero Airflow Conditions (455f727e-189c-461a-817c-5b4e28f77c28)
By John C. Edwards, F. Friel, John J. Opferman, Robert A. Franks
A series of diesel fuel fire experiments were conducted in the Pittsburgh Research Center's Safety Research Coal Mine (SRCM) to determine products-of combustion (POC) spread rates along a single
Jan 1, 1997
-
A New Diatomite Resource In Egypt
By M. I. Al-Wakeel
Nile sediment was collected as a waste from one of the water treatment plants in Cairo, and subjected to petrographical investigation and granulometric, chemical, and mineralogical analyses. It was ex
Jan 1, 2008
-
Leadership Versus Management: Observations On The Successes And Failures Of Cost Reduction Programs
By B. Cavender
Mining managers trying to rapidly reduce production costs tend to implement a traditional set of top-down managerial practices: layoffs of employees, renegotiation of supplier contracts, cancellation
Jan 1, 2000
-
Mineralogical Characterization and Preliminary Beneficiation of the Zoro Lithium Project, Manitoba, Canada "Mining, Metallurgy & Exploration (2021)"
By Toby Mayo, Tassos Grammatikopoulos, Massoud Aghamirian, MARK FEDIKOW
The Zoro pegmatite project in east-central Manitoba occurs 20 km east of the historic mining town of Snow Lake. A composite sample (Master Comp) was prepared fromthree pegmatite zones within Zoro Dyke
Sep 16, 2020
-
Elements Of Graphical Mine Planning
By W. A. Wilkinson
In creating a surface mine design, a complicated series of events may be required to meet both mining and environmental objectives. Envisioning the mine at every step of the operation can greatly assi
Jan 1, 2002
-
Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite Ores
By J. M. Ekenes
New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser
Jan 1, 2012
-
Geochemical types of sulfide ore as indicators of mineral evolution at the hydrothermal vent field Jubileynoye (MAR)
By Anna Sukhanova, Svetlana Babaeva, Sergey Andreev, Victor Beltenev
"The Zenith-Victoria /1/ and Jubileynoye /2/ hydrothermal fields have symmetrical structural position on the Mid Atlantic Ridge (Fig. 1). In order to compare the evolution of hydrothermal systems, we
Sep 1, 2014
-
Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio
By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski
Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p
Jan 1, 2005