A Quality Control System For Augered Cast-In-Place Pile Installation
By George G. Goble
The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very
Jan 1, 1997
-
Conventional And Box-Shaped Piled Rafts
By Heinz Brandl
Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The
Jan 1, 2002
-
Interlocking H-Sections For Cofferdams Resist High Pressure
By Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983
By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay
By Susheel R. Kolwalkar
A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred
Jan 1, 2008
-
An Overview Of Soil Mixing In The United States ? Introduction
By Peter J. Nicholson
Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do
Jan 1, 2001
-
Session IV - Notable International Projects - Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:
By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In Sand
By Giuliana A. Zelada
This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature
Jan 1, 2000
-
New Technologies For Quality Control Of Augered Cast-In-Place Piles
By Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Suction Piles And Suction Anchors For Offshore Structures
By S. Bang
In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien
Jan 1, 2009
-
"Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."
By Alexander J. Verstraeten
Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de
Jan 1, 1987
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes
By John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile Groups
By Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018
-
Installation Of Augerpiles In Low Headroom And Restricted Access Conditions
By Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - Introduction
By Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History
By Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?
By Paul Doherty
Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress
Jan 1, 2009
-
Vibwall Installation - Cardiff Bay Barrage ? Synopsis
By Graeme McWhirter
This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe
Jan 1, 2000
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting
By Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Installation, Design, And Quality Control Of Augercast Piles ? Introduction
By William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990