Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Dynamic Testing For Bored Pile Bearing Capacity - Summary

    By Jörn M. Seitz

    Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use

    Jan 1, 1987

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    American Practice In Design And Installation Of Driven Piles For Structure Support

    By Hal W. Hunt

    Heavier loading and more efficient equipment is helping to keep driven piles competitive in America. Better Knowledge and testing of soils and support materials make it practical to use higher stresse

    Jan 1, 1987

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    Dynamic Monitoring Program Results Indicator Pile Tests -I-880 - Introduction

    By D. Michael Holloway

    The realignment of Interstate 880 replaces the double-decked (Cypress) viaduct collapsed in Oakland, California during the 1989 Loma Prieta Earthquake. The California Department of Transportation (CAL

    Jan 1, 1996

  • DFI
  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing

    By Michael D. Justason

    ...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th

    Jan 1, 2001

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC

    By Anil Bhandari

    Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq

    Jan 1, 2011

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.

    By W. G. K. Fleming

    The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and

    Jan 1, 1999

  • DFI
    Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits

    By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto

    "Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained

    Jan 1, 2014

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018