Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Pile Design And Construction Challenges In Partially Thawed Alaskan Soils

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas

  • DFI
    Safe Load Of A Single Pile In Earthquake Loading - Synopsis

    By Shamsher Prakash

    Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t

    Jan 1, 1996

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Soil Mixing Monitoring System Quality Control for the SR-83 Project in Florida

    By Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni

    "SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl

    Jan 1, 2017

  • DFI
    Alternative Deep Foundation Solutions – DMM at LPV-111 in New Orleans

    By Peter Cali, Wesley Schmutzler

    "The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t

    Jan 1, 2017

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    Deep Mixing Core Data from LPV 111

    By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu

    "One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing

    Jan 1, 2015

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021

  • DFI
    Completely Automatized Recognition of the Installation Process in Special Foundation Construction

    By Christian Hoyme, Jochen Maurer, Hans Regler

    Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be

    Sep 8, 2021

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Instrumented Pile Load Tests In The Area Of Pearl Harbor, Hawaii

    By John Y. L Chen

    This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex

    Jan 1, 2002

  • DFI
    Drilled Piers Support Massive Gantry Crane

    By John R. Davie

    This paper describes the design and construction of two 5.6 MN capacity drilled piers installed to support the main loading elements of a large cantilevered gantry crane. The critical crane columns we

    Jan 1, 2006

  • DFI
    Geophysical Investigations Enhance Geologic Characterization In Support Of Pile Foundation Program

    By Mario Carnevale, Myles Danforth, Michael Oakland

    The cost and overall effectiveness of foundation design depends on a robust characterization of the subsurface geologic setting. It is common practice to formulate deep foundation design from subsurfa

  • DFI
    A History Of The Use Of ACIP Piles For Major Projects In Atlanta

    By Willie M. NeSmith

    In the Metropolitan Atlanta Area today, augered, cast-in-place (ACIP) piles will be considered on most projects where deep foundation support is required. ACIP piles were first used in Atlanta in the

    Jan 1, 2003

  • DFI
    The Effects Of A Direct Electrical Current On The a Value Of Metallic Piles In Clay - Synopsis

    By Stephen T. Bloomer

    The application of a direct current electrical potential between a metallic pile and a fine grained soil results in an almost instantaneous change in the magnitude of the forces acting on the pile.

    Jan 1, 1996

  • DFI
    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    Vertical Bearing Capacity of Pile Installed by "EX MEGATOP" Method - Base Enlarged Pre-boring and Grouting Method for Pre-cast Pile

    By Hitoshi Ogura, Koichi Kobayashi, Sadao Yabuuchi

    "In Japan, most pile foundations using pre-cast concrete piles are installed by the bored pre-cast piling method, wherein pre-cast piles are installed in holes that have been excavated beforehand and

    Jan 1, 2005

  • DFI
    The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 Years

    By Brian Wilson, Franz-Werner Gerressen

    "Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch

    Jan 1, 2015