    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural Support

    By Donald Bruce

    The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
    Screw and Straight Pile Behavior under Cyclic Compressive Loading in Dense Sand

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano, Shinya Tachibana

    "The helical piling system provides solution to many geotechnical related problems due to its quick installation, higher compressive and pullout resistance, no wastage of material, workable in limited

    Jan 1, 2016

  • DFI
    Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation

    By Rouzbeh Vakili, Adel M. Hanna

    "The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und

    Jan 1, 2017

  • DFI
    Difficulties In Caisson Construction

    By Ronnie W. Sisk

    1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum

    Jan 1, 1988

  • DFI
    Making Foundation Design Courses More Engaging and Effective for Students

    By Evangelia Ieronymaki

    Civil engineering education relies on traditional methods of teaching, comprising mostly of deductive instruction by presenting the theory, followed by applications. This paper presents an alternative

    Jan 1, 2019

  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • DFI
    Probabilistic Subsurface Characterization for Transmission Line Foundation Design

    By Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok

    "Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc

    Jan 1, 2017

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • DFI
    Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff Clays

    By Alexander Scheuermann, Martin D. Larisch, David J. Williams

    "Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den

    Jan 1, 1900

  • DFI
    Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro

    By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam

    Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria

    Sep 1, 2022

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Guidelines for Selecting Cutoff Wall Systems

    By Mary Ellen Large

    This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system

    Jan 1, 2021

  • DFI
    Westlink Projects – Geotechnical Challenges During The Execution Phase

    By Robert Thurner, Albin Norrman, Sami U. Raja

    The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s

    May 1, 2022

  • DFI
    Analysis And Design Of A Piled Foundation For A Tall Tower ? Synopsis

    By I. K. Ozaydin

    Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower

    Jan 1, 2010

  • DFI
    Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation

    By Zachary Q. Maassen

    Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio

    Jan 1, 2019

  • DFI
    Assessment of the Durability of Cementitious Barrier Materials

    By Stephan A. Jefferis, Adrian H. Bath

    "This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre

    Jan 1, 2016

  • DFI
    Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl Tests

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD

    The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval

    Oct 1, 2022

  • DFI
    Shoring Design of Historic LA Metro Station

    By Babak Mamaqani

    The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi

    Apr 1, 2022

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016