Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Secondary Recovery of Bitumen Using Jameson Downcomers

    By R. Siy, O. Neiman, B. Hilscher

    "A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty

    Jan 1, 2012

  • CIM
    Bench and Pilot Scale Test Programs to Specify Autogenous Grinding Circuits

    By C. J. Farrow, M. J. Smith

    "Bechtel has managed a number of test programs to establish autogenous grinding circuits and size mills for a variety of ores.This paper outlines the procedures whereby bench scale and pilot plant tes

    Jan 1, 1982

  • CIM
    Radioactive Elements Associated With Rare Earths - Identity and Management

    By L. M. Lowe, D. G. Feasby, J. R. Goode

    "Rare earth resources usually contain minor amounts of radioactive elements. The most widely recognised sources of radioactivity are associated with thorium and uranium. However, also present in the r

    Jan 1, 2014

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001

  • CIM
    Andritz Metals Spray-Roast Acid Regeneration Pilot Plant

    By S. K. Mitterecker, T. Hofbauer, F. Baerhold

    "Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis

    Jan 1, 2016

  • CIM
    X-ray barium sulphate for North America

    By J. D. Nye, I. A. Farr, W. J. D. Stone

    "A unique deposit of barite exists near Brookfield, Nova Scotia. The crystals are extremely fine and the whole deposit virtually free of heavy metals. The deposit size was not large enough for convent

    Jan 1, 1980

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • CIM
    Milling Operations at Omai Gold Mines

    By Eric Konigsmann

    "Omai Gold Mines is a large scale open pit gold mining operation located in central Guyana, South America with a 12,000 tonne per day milling facility. Mill operations were initiated in December 1992

    Jan 1, 1994

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    Applying tracer gas techniques to evaluate the air distribution in flood leaching stopes

    By A. Sheikh, S. Hardcastle

    "Various methods of leaching are being used by Denison Mines Ltd. Uranium Operations. This study was designed to investigate the flood leaching operation of two parallel inter-connected stopes contain

    Jan 1, 1988

  • CIM
    The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency

    By Robert E. McIvor

    "The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci

    Jan 1, 2009

  • CIM
    Best-in-class maintenance benchmarks in Chilean open-pit mines

    By P. Oyanader

    "In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively r

    Jan 1, 2005

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    Mining Community Sustainability and well-being in British Columbia, Canada

    By Janis A. Shandro

    The mining sector is a major economic driver for Canadian, and British Columbian communities. In parallel strong commitments have been made by industry to the well-being and sustainability of associat

    May 1, 2011

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014