Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    An Excavating Power Model for Continuous Surface Miners

    By Kramadibrata S

    Over the years many attempts have been made to develop a means of assessing the excavatability of rock. Most of them are based on an empirical rating system while some authorities still propose the us

    Jan 1, 1995

  • AUSIMM
    "Impact of Mineralogical Variation on the Smelting of Cu-Ni-PGM Concentrates"

    By J J. Eksteen

    "In the platinum group metals (PGM) industry, smelters are often perceived as ‘black boxes’ that have to process concentrates of variable mineralogy and originating from multiple mines operating along

    Jun 15, 2016

  • AUSIMM
    Mineral project risk and orebody knowledge – quantifying the value of drilling using decoupled net present value analysis

    By D Espinoza, I Rees, J Pocoe, P Collier

    P Collier, I Rees, J Pocoe and D Espinoza

    Mar 22, 2022

  • AUSIMM
    The Development of High Efficiency Spiral Separators

    By Ritchie IC

    Spiral separators have been used to treat heavy mineral sands in Australia for some thirty-five years. They were used as the primary treatment method until the advent of the Reichert cone, which l

    Jan 1, 1986

  • AUSIMM
    Technical Aspects of Reopening Gold Mines in Victoria

    By McCarthy PL

    Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim

    Jan 1, 1982

  • AUSIMM
    Resource Estimation Approaches for Several Precious Metal Deposits Developed by Placer Group on the Pacific Rim

    The process of resource estimation of large precious metal deposits is illustrated by reference to major deposits now being mined or developed by Placer.The estimation procedure commences with buildin

    Jan 1, 1990

  • AUSIMM
    An Institutional Overview of Mineral Valuation Methods

    Portfolio management tends to separate the functions of Asset Allocation and Stock Selection, so the person responsible for reviewing an expert's report on a company would typically be choosin

    Jan 1, 1994

  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Some Notes on Diamond Drilling Practice at Mount Isa

    The Black Star lead and zinc ore-bodies, situated in the western zone of mineralisation at Mount Isa occupy an area 2000 ft. long with varying widths from 100 ft. to 300 ft. The strike is N5°W, a

    Jan 1, 1932

  • AUSIMM
    Sampling Surficial Sediments of a River Receiving Minewater Discharges

    By Adeloju S, McQuade CV, Riley SJ

    Metal contamination of sediments can be an issue for minesites discharging water. Water sampling of receiving waters is frequently undertaken. Sampling and analysis of sediment is less common. The var

    Jan 1, 1998

  • AUSIMM
    Influence of the Sloping of Ground Surfaces on Mine Subsidence

    By Bhattacharyya AK

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the

    Jan 1, 1992

  • AUSIMM
    Integrating Data, Applications and Users

    By McAuley T. J

    Computer software is an integral part of mining operations today with many sites using six or more software packages on a daily basis. However, the use of these different programs generates the need

    Jan 1, 1995

  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand (9bf77519-b580-47e8-9eb8-9b83d23a66f7)

    By Brathwaite RL

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bear in the Marlborough Schist. Most of the production came from the Empire City and Golden Ba

    Jan 1, 1995

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    A New Mine Project - The 3000 and 3500 Copper Orebodies at Mount Isa

    The large, high grade 3000 and 3500 copper orebodies at Mount Isa lie greater than 1200 m below the surface, and partly beneath the silver-lead-zinc mining operations at the Isa Mine.Since discovery o

    Jan 1, 1993

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Wheal Gawler

    Wheal Gawler was Australia's first metal mine. This leader was followed by an army of other metalliferous underground mines and surface operations in Australia. As a mine it was not highly si

    Jan 1, 1987

  • AUSIMM
    In-Situ Leaching of Oxide Gold Deposits

    In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o

    Jan 1, 1991

  • AUSIMM
    The Loy Yang Overburden System

    The Loy Yang Overburden System initially consists of a 60 000 tonne/day Bucket Wheel Excavator (BWE) (No. 14), a 2 m wide Conveyor System and a Travelling Stacker (No. TS4). The paper discusses deta

    Jan 1, 1982