Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Future skills and workforce evolution – training and skills development for mining operation engineer and drill and blast engineer in surface mineral mine PT Indo Muro Kencan

    By H Utama, R Heryadi

    PT Indo Muro Kencana (PT IMK) is a surface gold and silver mine located in Mt. Muro area, Central Kalimantan province, Indonesia. The mining operations of multiple open pits using combination of excav

    Sep 1, 2024

  • AUSIMM
    Chromite for the Production of Chromium Chemicals

    By Lawson F

    Chrome chemicals are commercially produced by the alkali roasting of the chrome-bearing ore chromite with sodium carbonate. In order to ascertain the influence on the extent of reaction of the replace

    Jan 1, 1984

  • AUSIMM
    Experimental Study of Computer Stimulation of Bench Blasting in Production Scale

    Production scale experiment study was carried out in a limestone open-pit for testing the theory and method proposed by the author(Zou, 1987). The results of experiments indicate that the mathematica

    Jan 1, 1990

  • AUSIMM
    Nickel and Cobalt Losses During Dissolution and Oxidation of Iron Powder in Ammoniacal Medium Using Oxygen over Pressures

    By Rath M. C, Das R. P

    Studies were carried out on dissolution and oxidation of iron powder in ammonia-ammonium carbonate solution using oxygen over pressures. Cobalt and nickel losses during iron oxidation under differen

    Jan 1, 1992

  • AUSIMM
    Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western Australia

    Current problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r

    Jan 1, 1988

  • AUSIMM
    Preliminary Ventilation Design ù Ballarat Goldfields

    By R Nakia, R Livingstone

    Historically the Goldfields of Victoria produced large volumes of gold. Interest in these historical Goldfields has grown over recent years with a view to restarting production of gold. A notable exam

    Jan 1, 2003

  • AUSIMM
    The Thermodynamics of Cobalt Dissolution in Iron Silicate Slags

    By Liu X

    The solubility of cobalt oxide in iron silicate slags has been measured at 1573 K by equilibration of silica and alumina saturated slags with liquid Co-Au-Fe alloys, and by equilibration of silica u

    Jan 1, 1991

  • AUSIMM
    Rock Breaking on the Melbourne Undergroudn Rail Loop

    Techniques and results achieved during the excavation of the Melbourne Underground Rail Loop (HURL) are summarised and discussed in the context of the various restraints present in a typical urban

    Jan 1, 1978

  • AUSIMM
    Development of New High-Strenght Zinc Alloys

    By Kubo H, Ninomiya R, Ojiro T, Sato T

    New high-strength Zn alloys for moulds are demanded from the automobile and electric industries in Japan, because the s rength of Zn moulds is still not high enough for the mass production. There ar

    Jan 1, 1993

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New Fans

    Full aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an

    Jan 1, 1967

  • AUSIMM
    Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte

    By Abishev D. N, Balakirev V. F, Davydov G. I

    The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol

    Jan 1, 1996

  • AUSIMM
    Aggregate Size Optimisation Program at the Lafarge Marblehead Plant

    By C Smith, D Lilly

    The Lafarge Marblehead Plant in Marblehead, Ohio, USA produces 4.2 million tonnes of sized aggregate yearly. In 1997, a program was instituted to maximise primary crusher productivity through the opti

    Jan 1, 2007

  • AUSIMM
    Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong

    By I P. W Chau

    Construction of twin stacked railway tunnels through mixed ground conditions in the heavily populated urban environment of Hong Kong, including tunnelling in poor ground conditions, with low cover and

    Jan 1, 2008

  • AUSIMM
    Rate of Production and Cutoff Grade-A Program Systems for Teaching and Experimentation

    By Daoust G, Dubois JF

    The optimal sequence of decisions on rates of production and cutoff grades is obtained by a dynamic programming model. The main parameters are : 1. the size of the deposit, average grades and grad

    Jan 1, 1977

  • AUSIMM
    Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines Limited

    By Griffin PT, Espinosa-Gomez R, Jameson GJ

    Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh

    Jan 1, 1993

  • AUSIMM
    Paper No. 193. Filter-Pressing.

    THE filter-press, which has done so much for the successful-treatment of the sulpho-telluride ores of Kalgoorlie, has a serious rival in the vacuum process, and this paper is written with a view to ar

    Jan 1, 1911

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    Triassic to Early Cretaceous Tectonic Evolution of New Zealand Terranes: A Summary of Recent Data and An Integrated Model (97c64f36-733a-492e-986c-d34782b6a88f)

    Recent data contributions to New Zealand Mesozoic terrane geology confirm the consensus interpretation that New Zealand grew by the progressive addition of material by plutonic and accretionary proce

    Jan 1, 1995

  • AUSIMM
    Strategies for Minimising and Predicting Dilution in Narrow Vein Mines û The Narrow Vein Dilution Method

    By R Trueman

    An improved ability to predict dilution for narrow vein deposits enables more accurate economic comparisons between mechanised longhole stoping and other narrow vein mining methods, as well as reducin

    Jan 1, 2008