Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Aseismic Bearing Capacity Of Pile Foundation ? Synopsis
By J. X. Wu
An investigation on the seismic damage to buildings with pile foundations in Tianjin region, was conducted after the earthquake which hit Tangshan in 1976. It showed that most pile-founded buildings h
Jan 1, 2010
-
RI 9676 - Explosion Effects on Mine Ventilation Stoppings
By Eric S. Weiss
The National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Administration (MSHA) conducted joint research to evaluate explosion blast effects on typical U.S. mine
Jan 1, 2008
-
Challenges in Niobium Flotation
By S. Kelebek, C. Gibson, M. Aghamirian
"Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil
Jan 1, 2015
-
A Re-Interpretation of the Burra Burra Copper Deposits
The Burra Burra Mine is situated in complexly folded Torrensian dolomites and limestones forming the faulted axial region of a major anticline. The orebody mined was largely of secondary origin and co
Jan 1, 1963
-
Predicting Nickel Recoveries at the Thompson Mill from Feed Mineralogy
By F. D. Ford, Z. Dai, A. Byers
Manitoba Mining and Milling operations consist of three underground mines (Thompson T1, T3 and Birchtree), feeding the Thompson Mill. Three years ago, a collaborative effort involving Mines Exploratio
Jan 1, 2015
-
Automatic Landslide Monitoring Using Terrestrial-Based Static Lidar
By M. Leslar
Slope monitoring has been an important issue in static terrestrial lidar for some time. Several solutions for monitoring the progress of a slide have been devised over the years. All of these solution
Feb 27, 2013
-
Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity Recoveries
By Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon
"Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have
Jan 1, 2011
-
Optimización de ore control con metodología Six Sigma
By Lytman Jordán
En la actualidad, el proceso de Ore Control de Tintaya se convierte en un reto porque la naturaleza del yacimiento Metasomático de Contacto Tipo Skarn presenta una mineralización compleja a manera de
Sep 9, 2007
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests
By Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Training to Process Analysis Methods using a Gold Leaching Simulator
By Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne
"A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac
Jan 1, 2008
-
Engineering Geophysics for the Mining and Construction Industries
By Douglas Rudenko
Most engineers, mine operators, or contractors acknowledge the importance of having accurate subsurface information in order to plan a project or solve a problem. Conventional methods of exploring the
Jan 1, 1998
-
Parameters for Cyclone Selection
By Norman A. Jull
"Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on
Jan 1, 1972
-
Geologic Investigation Of The Muskeg River Mine, Ft. McMurray, Alberta
By M. Fustic, A. H. Paul
The geology of the Muskeg River Oil Sands Mine is described to demonstrate how geologic modeling aided in resource evaluation and material characterization during the feasibility and construction stag
Jan 1, 2002
-
Proceedings Of The N I N E T Y - F I F T H Meeting, Chattanooga, Tenn., October, 1908.
By AIME AIME
LOCAL COMMITTEES. GENERAL RECEPTION COMMITTEE.-Mr. and Mrs. H. S. Chamberlain, Mr. and Mrs. J. T. Lupton, Mr. and Mrs. T. H Lasley, Mr. and Mrs. R. S. Faxon, Mr. and Mrs. H. Clay Evans, Mr. and Mrs.
Nov 1, 1908
-
Implementation of a Flotation Expert Control System at the Raglan Mine
By G. Couture
"The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o
Jan 1, 2015
-
Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland
By Patterson B. G
The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri
Jan 1, 1939
-
Stratablasttm - A New Mining Method
By T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Milling Circuit Control and Optimisation: The Millstar with IES
By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert
"An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud
Jan 1, 2000
-
IC 7243 First Organization And Work Of The Coal-Mine Inspection Division, Bureau Of Mines ? Introduction
By authority of the Federal Coal-Mine Inspection Act of May 7, 1941, Public Law 49--77th Congress, H.R. 2082,2/ a Coal-Mine Inspection Division was established in the Health and Safety Branch of the B
Jan 1, 1943
-
Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.
Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb
Jan 1, 1949