Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine TrucksBy Robert M. Stevens
INTRODUCTION Truck haulage of muck in underground mining operations has been in use around the world for many years. From the late 1.950s into the early 1970s, haulage by means of load-haul-dump (LHD
Jan 1, 1982
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment PlantsBy Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Remote-Control Monitoring Cuts Maintenance CostsBy Michael W. Lewis
The latest downturn in the world’s metal prices has forced many mining companies to focus on cost reduction and productivity improvements to remain competitive. Maintenance represents a significant p
Jan 1, 2000
-
Key Success Elements Of Coal Pillar Extraction In New South WalesBy G. H. Lind
Seven full and partial pillar extraction operations were visited in New South Wales, Australia, in the early parts of 2001. Certain factors unique to these operations have led to the general success
Jan 1, 2002
-
The Extraction Nickel from Nickel Sulphides and Nickeliferous Laterites Using Chlorinated ParaffinsThe passage of chloroform vapour in a carrier of oxygen through two nickel sulphide ores heated to 380°C converted the nickel to the water soluble chloride form. In one ore the nickel (2·75
Jan 1, 1972
-
Press-In Piling: The Influence Of Plugging On Driveability - 1 Introduction - 1.1 Urban Construction Of Deep FoundationsBy David J. White
The decreasing availability of land in urban areas, and the increasing demand for urban development is leading to the construction of taller and heavier buildings at increasingly marginal sites. Such
Jan 1, 2000
-
Vari-Stem Blasthole Plugs Improve Blasting PatternsIn September 2003, a test was conducted to see if a115-mm- (4.5-in.-) diam Mocap Vari-Stem blasthole plug could improve the pattern of explosives using different top stemming material. The test too
Jan 1, 2004
-
Metallurgy of the Mt. Milligan Porphyry Gold/Copper DepositBy A. B. Cron, R. MacPhail, L. Melis, K. Armstong
"Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1
Jan 1, 1991
-
A Cyclone Furnace for Slag FumingLaboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti
Jan 1, 1964
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
Roadheader Tunneling and Microtunneling in Low Strength Claystone at Standley Lake, ColoradoBy Glen Church, Don W. Deere, Christoph M. Goss
The Standley Lake Dam Rehabilitation Project in Colorado included the complete replacement of the outlet works. This required two 1.8m (6 ft) diameter microtunneled wet lake taps, 380m and 186m (1246
Jan 1, 2005
-
Research into fire fighting and fire prevention in South AfricaBy A. Whillier
The decisive action taken by mine managements in recent years has been the main factor in bringing about the present downward trend in mine fires. A better understanding of the fundamental factors tha
Jan 1, 1981
-
The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)
Sep 13, 2010
-
Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore DepositA localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area
Jan 1, 2014
-
RI 6020 Electron Micrographs Of Some Unusual Inorganic Fibers ? Introduction And SummaryBy Charles W. Huggins
A study of the high magnification of some inorganic fibers which are found in nature or produced in the laboratory, has been conducted with the electron microscope. This series of electron microqraphs
Jan 1, 1962
-
Possible Binders For Pelletizing Of Magnetic Taconite Concentrates (801228ef-1932-412e-8bb6-57bc8e57c7cd)By J. A. Clum, R. W. Heins, T. D. Tiemann
The use of Na-montmorillonite clay hinders (Western Bentonite) in the pelletizing of iron ore concentrates is well established as is the idea that alternative binders must be found. 1-6 This note summ
Jan 1, 1979
-
Relationship of source and drainage geochemistry in the British paratectonic Caledonides: an exploratory regional assessmentBy T. M. Williams, P. M. Green
Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. The sediment geochemistry of streams draining Southern Uplands and Lake Di
Jun 19, 1905
-
Planning Of An Urban Transportation FacilityBy Mohamed Yusuff
Modern transportation systems are one of the most important achievements of our civilization and provide us with tools for broadening individual and social freedom of choice. The transportation system
Jan 1, 1974
-
Strengthening Of A Cold Worked 17% Cr Ferritic Stainless Steel (Type 430) By Heat TreatmentBy M. Sephton
Slat-band chains, currently manufactured from Type 430 ferritic stainless steel, are used as conveyors in various industries. A process to strengthen these chains?with the aim of prolonging the lifeti
Jan 1, 1997
-
High Pressure Water-Powered Scrubbers For Continuous Miner Dust ControlBy Robert A. Jankowski, Charles Babbit, Natesa I. Jayaraman
The Bureau of Mines, together with Foster Miller Inc., has developed a compact, high pressure scrubber system for continuous miners. Powered by water energy alone, it can move up to 1.4 m3/s (3,000 cf
Jan 1, 1989