Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales
The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of
Jan 1, 1930
-
Possibility of Organizing and Analyzing Drilling - Blasting with a Computer Program (DelPat)
By Cceliksirt, V Erkan
This computer program has been developed under the field conditions for use in control of surface drilling-blasting operations. This paper outlines the relevance of fragmentation to quarrying, open pi
Jan 1, 1998
-
Passive Integrating Measurements Of Radon And Thoron: Methods And Field Observations
By S. Murdock, R. L. Fleischer, H. W. Alter, J. E. Gingrich
The use of solid state track deters allows totally passive, integrating measurements of 222Rn (radon) or of 220Rn (thoron) plus radon. A track-detecting solid is placed in a holder that is closed by a
Jan 1, 1981
-
Metallurgical Strategy at Sturgeon Lake Mill
By C. P. Patel
"The Sturgeon Lake Joint Venture volcanic massive sulpide deposit was discovered in 1970. Milling was started by Falconbridge Copper Ltd. at Sturgeon Lake in September 1974. The Sturgeon Lake pit and
Jan 1, 1980
-
Application of an environmental valuation approach that incorporates externality costs in sustainability decision-making of the metallurgical sector - Synopsis
By M. Nyoka
Consideration of the economic, environmental, and social impacts associated with the life-cycle of a technology is of increasing importance for decision-making in industry. It has been suggested that
Jan 1, 2007
-
Annual Report and Accounts (1967)
COUNCIL The following served on Council during the year under review: Office bearers: Prof D. D. Howat (President), Dr J. P. Hugo and P. W. J. van Rensburg (Vice-Presidents), V. C. Robinson (Immed
-
Limitations of Safety Arrest Mechanisms for Mine Shaft Conveyances
By Gorzalczynski. Stan
The recent trend in underground mine developments is ?big is better?. This is most certainly evident in the mine shaft and the conveyances that operate within its compartments. Today, there are severa
May 1, 2002
-
Vibration Analysis Of Large Tumbling Mills
By B. K. Mishra
In order to maintain higher grinding efficiency in tumbling mills the mill interior and dynamics must be known. For this purpose, several different types of non-intrusive methods have been proposed an
Jan 1, 2011
-
Beneficiation Of Zircon Sand In South Africa - Synopsis
By S. Lubbe
South Africa and Australia are the biggest suppliers of zircon sand to the international zirconium industry. However neither South Africa nor Australia is well known for zircon beneficiation. Geratec
Jan 1, 2012
-
The Performance Of Brunswick Mine?s Rockburst Support System During A Severe Seismic Episode
By B. Simser
At Brunswick Mine, an increase in the number of seismically-related falls of ground and in particular rockbursts occurred during 1999. This was due to the ever-increasing stress levels in the remaini
Jan 1, 2002
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes
By Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Protection Against Litigation with Good Pre-Blast Surveys, Damage Inspections and Record Keeping
By Randall Wheeler, R. Frank Chiappetta
2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation. and Explosives Applications - Orlando, Florida, USA July 24 - 27,200O 2000 BAI - PROTECTION AGAINST LITIGATION WITH GOOD PRE-BLAST SURVEYS,
Jan 1, 2000
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and Exploration (afe55b4e-c2bb-46a0-a2d9-37ae31a22959)
By Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and Exploration
By Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC
By Ed Beswick
Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design
May 1, 2008
-
Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In Illinois
Roof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution
Feb 27, 2013
-
Underpinning The Existing No. 1 Subway Line At The World Trade Center
By Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
RI 7001 Thermodynamic Properties Of Three Lithium-Aluminum Silicates
By L. B. Pankratz
The Bureau of Mines measured heat capacities of alpha and beta spodumene (LiAlSi2O5) and of beta eucryptite (LiAlSiO4) over the temperature range 51° to 298° K. The entropies at 298° K were found to b
Jan 1, 1967
-
Two-Mass Vibrating Screens for High Tonnage Applications
By Steve Massman, Edward Wipf, Gary Beerkircher
"As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000
Jan 1, 2017
-
Top Hammer Drilling-The Way Things Work
By William D. Hissem
For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.
Jan 1, 1998