Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Subsidence and Uplift Prediction in German and Polish Hard Coal Mining

    By Axel Preusse

    For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam

    Jan 1, 2012

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Influence Of Discontinuity Orientations And Strength On Cavability In A Confined Environment

    By L. J. Lorig

    Much of the present knowledge about caving behavior of rock masses has been obtained from empirical observations. Additional notions about caving have been developed through inferences derived from tw

    Jan 1, 1989

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Understanding the hydraulic pressure cell

    By Keith A. Heasley

    Numerous different instruments and techniques have been developed for the purpose of measuring rock stress and stress changes around excavations. The interpretation of the output from many of these in

    Jan 1, 1989

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Comparison among the Conventional Fully-Grouted Bolt, Combination Bolt, and One-Step Bolt Using Numerical Modeling

    By Andre Zingano

    The objective of this paper is to compare the behaviors of different types of roof bolts: (1) One-Step Bolt (OSB), (2) Fully grouted Bolt (RB), (3) Combination Bolt (CB), and (4) Torque tension Bolt

    Jan 1, 2007

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • SME-ICGCM
    Jenmmar Compression Roof Control System

    By John C. Stankus

    To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves

    Jan 1, 1990

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012