Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Cable Bolting - Potential Applications For Variable Strata Conditions

    By David Allen

    Cable bolting is a relatively new strata reinforcement technique that has been used successfully in Australia and the United Kingdom. Jim Walter Resources, Inc. has examined the principles and can vis

    Jan 1, 1994

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Laboratory And Field Characterization Of Immediate Floor Strata In Illinois Basin Coal Mines

    By Yoginder P. Chugh

    The characteristics of weak floor strata associated with actively mined coal seams in Illinois are very important from ground stability point of view and, in many cases, are the governing factors in d

    Jan 1, 1989

  • SME-ICGCM
    Controlled Blasting During Drifting In Hard Rock Mine

    By S. P. Singh

    Drifts are an integral component of underground mining. They provide access for men and material, means for transporting ore and rock and serve as air passageways. In view of their importance on the o

    Jan 1, 1990

  • SME-ICGCM
    Numerical Modeling of Stress Distribution of Gateroads Subjected to Dynamic Pressure of Longwall Mining in the Immediate Overlying Seam, a Case Study

    By Ximeng Li

    The entries that are subjected to dynamic pressure are much more difficult to maintain due to repeated disturbance. A case study of an entry stress distribution was performed using the FLAC3D program.

    Jan 1, 2013

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Convergence And Load Measurements In An Underground Mine In [Türk±ye]

    By A. G. Pasamehmetoglu

    This paper describes the conver¬gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventional tim

    Jan 1, 1992

  • SME-ICGCM
    Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow Mine

    By Robert J. Coutts, Dan A. Payne

    "The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part

    Jan 1, 2010

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    Work Practices to Manage Bump Prone Ground

    By Floyd Varley

    In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not

    Jan 1, 2008

  • SME-ICGCM
    Modal Testing and Dynamic Finite Element Analysis of a Roof Bolter?s Drilling Boom

    By Youzhen Zhang

    The drilling boom is the key component of a roof bolter, and it has significant impact on the performance, safety, and reliability of the overall working device. In this paper, the experimental modal

    Jan 1, 2012

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    Three-Seam Interaction: A Case Study

    By N. P. Kripakov

    Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath

    Jan 1, 1996

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Indian Experiences Of Mechanised Coal Pillar Extraction (b04565f5-fd0b-4a80-a8aa-fcb98125fe52)

    By Arun Kumar Singh

    Wide variation in the nature of the coal seams and the surrounding rock mass of the Indian coalfields and very little information about the associated stress fields were observed to be the major hurdl

    Jan 1, 2009

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009