Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Modeling Software for Less Than $1000 – Usefulness and Limitations
By Betty L. Gibbs
Geologically simple deposits can be modeled quickly and easily with inexpensive gridding and mapping software. Hundreds of mines around the world use RockWorks99 and Surfer 7 for generating contour m
Jan 1, 2000
-
Disc Cutter Performance in Boulder-Laden Ground ? Introduction
By D. S. Kieffer
Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl
Jan 1, 2008
-
Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit
By C. Deutsch
Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells
Jan 1, 2007
-
Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method
A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
Coal 1985
By C. Heath
US coal consumption reached new heights in 1985, but production was constrained by excess consumer inventories. Domestic consumption of coal reached a record 742 Mt (818 million st) during the year. T
Jan 5, 1986
-
Rain Underground Mine, 1993-2002 Mining A Low-Grade Gold Resource In Weak Rock
By M. Kockler, S. J. Jung
Underground operations at the Rain Mine averaged 360 tonne/day (400 ton/day) utilizing underhand drift-and-fill and longhole stoping with delayed fill between 1993 and 2002. Mining from four ore zones
Jan 1, 2004
-
Bismark – Mexico’s New Major Zinc Mine
By J. C. Haptonstall
The Bismark Mine is located in northern Chihuahua, Mexico, 150 km (95 miles) southwest of Ciudad Juarez (Fig.1). The ore deposit was discovered in 1979 and was placed in production in 1992. The produc
Jan 1, 1994
-
Shortwall mining of trona using an advancing tailgate
By P. W. Hynes
Tg Soda Ash has operated a shortwall mining system in the Green River, WY trona district since August 1982. The system has proven to be highly productive. In an effort to reduce the amount of relative
Jan 1, 1990
-
Security of supply, sustainability and resource efficiency
By J. Geisler
When addressing Germany’s resource supplies, we need to distinguish between those domestically available and imported ones. Resource extraction ostensibly competes with the designation of protection a
Jan 1, 2011
-
Waterproofing And The New Austrian Tunnel Method (NATM)
By A. Kevin Beaton, Robert W. Laakso
The desire for dry passageways promotes the NATM as it provides a final support system most suitable for the installation of a waterproofing membrane. Waterproofing during construction is a cost effec
Jan 1, 1991
-
Porphyry Copper-Gold Deposits of the Southwest Pacific
By R. L. Andrew
The southwest Pacific has produced at least four of the world’s premier porphyry copper-gold deposits, and the current level of exploration is likely to produce even more. An appreciable amount of gol
Jan 1, 1995
-
‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake Mine
By Duane A. Smith
They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer
Jan 1, 2003
-
Production Experience With ASEA and Rotary Dump Cars at San Manuel
By T. B. Acton
There are two types of ore transportation systems in use at Newmont's Magma Copper Co. San Manuel mine in Arizona-rail-mounted, box-type rotary cars and the newer rail-mounted, bottom-dumping ASE
Jan 4, 1980
-
Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway
By Chris Bennett, Drupad Desai, Kirit Mevawala
INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg
Jan 1, 2005
-
Exploratory Shafts For The Nuclear Waste Repository In Basalt
By Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
Presentation Of Particle Beneficiation Test Results On An Equal Basis When Yield And Recovery Are Involved
By J. Drzymala
Particle beneficiation tests are often conducted to determine how the recovery of a key component of a particle mixture varies with overall product yield, i.e., the separation curve. The results can b
Jan 1, 2007
-
Evaluation of Mica as a Source of Potash Mining, Metallurgy and Exploration
By Nikhil Dhawan, Ashwini Kumar, Yogendra Pratap, Himanshu Tanvar
India does not possess any soluble potash reserves and depends completely on imports. In this study, an attempt has been made to recover potash (K) values from the mica sample employing thermal and me
-
American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock
By S. Schina
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme
Jan 1, 2001
-
Heap leach solution application at Coeur-Rochester
By A. L. Wilder, S. N. Dixon
Introduction Coeur d'Alene Mines Corp.'s largest precious metals property is located in the historic Rochester Mining District 40 km (25 miles) northeast of Lovelock, NV. The property enc
Jan 1, 1990
-
Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines
By S. E. Phillipson
During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t
Jan 1, 2006