Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Undergraduate Learning Commons

    By William M. Tanner, Daniel C. Brahana

    "A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,

    Jan 1, 2015

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History

    By Raffaella Granata, Daniele Vanni

    "This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o

    Jan 1, 2016

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)

    By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th

    Jan 1, 2016

  • DFI
    Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction

    By Patrick J. Hannigan

    The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio

    Jan 1, 1990

  • DFI
    Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United States

    By David R. Black

    Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for

    Jan 1, 2002

  • DFI
    An Alternative Pile Technology

    By Rimas Veitas, James Panton, Erich Steinlechner

    "Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend

    Jan 1, 2017

  • DFI
    Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments

    By Robert C. Simpson, Ghada S. Ellithy

    "There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi

    Jan 1, 2015

  • DFI
    Slope Stabilization of Mill Creek Landslide Using Steel H-Piles

    By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis

    "Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2

    Jan 1, 2015

  • DFI
    PSC Piles Overcome Challenges for $650m Power Plant

    By Tim Siegel, III Fondren, Billy Camp

    "INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic

    Jan 1, 2004

  • DFI
    Experiences From A Large Scale Driven Precast Piling Project In India

    By Rajesh A. Vaidya

    A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere

    Jan 1, 2007

  • DFI
    Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico

    By Justin Simmons, Michael Arnold, Bob Faulhaber

    "In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms

    Jan 1, 2017

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Current Pile Foundation Practice In Taiwan ? Synopsis

    By Za-Chieh Moh

    This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize

    Jan 1, 1996

  • DFI
    Deep Foundation Underpinning Support For Fort Monroe, Virginia YMCA Historic Building Renovation

    By David C. Kraft

    Atlas Systems, Inc. (ASI) resistance type piers were used to underpin a 100 year old historic structure at Fort Monroe, Virginia. This 3-story structure with basement was underpinned with 155 steel tu

    Jan 1, 2002

  • DFI
  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI