New Orleans Levee Improvement Project: An OPA Contender
By Filippo Leoni, Wesley Schmutzler
"The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot
Jan 1, 2013
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology
By A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & Construction
By Abid O. Adekunte
The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing
Jan 1, 2008
-
Experimental Study on Lateral Capacity of Single Pile Embedded in Cement-Treated Sand
By Takeshi Maki, Kh. Adeel Tariq
"The lateral resistance of the structure plays an important role during seismic event and it can be increased by using ground improvement. In this study an attempt has been made to investigate the eff
Jan 1, 2017
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations
By Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction
By Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Skilled Operative Training For The Foundation Industry - Summary
By Geoffrey Birch
A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski
Jan 1, 2000
-
-
Alameda Corridor-East: San Gabriel Trench Project
By David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles
By Timothy C. Siegel
Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi
Jan 1, 2010
-
2013 OPA Winner: Wolf Creek Dam Rehabilitation
By Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)
By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Dynamic Behavior Of Pile Foundations
By Yingcai Han
The dynamic behavior of pile foundations is investigated in both theory and practice. The computation method for vibration of pile foundations and DYNAN computer program are introduced comprehensively
Jan 1, 2002
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place Piles
By Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
PMF Remediation of Oxford Dam
By Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Skirt Suction Foundation - Application To Strait Crossings -
By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
An Active Soil Nail Wall Underpinning Solution
By Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction
By F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project
By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia
By Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015